Similar Projects
Glencoe Farms Road Water Main Improvements and Spruce Street Water Main Replacement
Post-Bid
Less than $275,000 est. value
Glencoe, New Smyrna Beach, FL 32168

FY 2019 Water Main Improvements
Results
Less than $1,400,000 est. value
De Land, FL 32720

Furnish and Deliver PVC and HDPE Pipe for 2019 Water Main Improvements
Results
De Land, FL 32724

Fort Florida Road Utility Improvements
Results
Less than $1,200,000 est. value
De Land, FL 32720

Reclaimed Water Main Extension Phase 4
Results
Less than $1,920,000 est. value
De Land, FL 32720

Utility Locating Services Annual Contract
Term Contract
Results
New Smyrna Beach, FL

Tatum Boulevard to Elizabeth Street Water Main
Results
Less than $400,000 est. value
Edgewater, FL 32132

Furnish and Deliver PVC and HDPE Pipe for Reclaim Water Main Extension Phase 4
Results
De Land, FL 32720

Annual Contract Fire Hydrant Testing, Inspection and Refurbishment
Term Contract
Results
New Smyrna Beach, FL

Lift Station #9 Replacement
Results
Less than $320,908 est. value
Holly Hill, FL 32117

Saxon Ridge Reclaimed Water Main Extension
Results
Less than $979,109 est. value
Deltona, FL 32725

4610--VHA Mar Cor Reverse Osmosis Water Purification BNOE | Sources Sought | 36U10120Q0029
Results

Potable Water and Fire Protection System Backflow Device Testing, Certifications and Repairs for the City of Deland FY 19/20
Term Contract
Results
De Land, FL

Thornby Park Water Quality Improvements Project
Results
Less than $367,000 est. value
FL

Construction Management/General Contracting Services for Deleon Springs Utility Extensions
Results
Less than $4,000,000 est. value
De Land, FL 32720

Last Updated 11/08/2019 03:56 PM
Project Title

Horizontal Directional Drilling Services

Physical Address View project details and contacts
City, State (County) Daytona Beach, FL 32720   (Volusia County)
Category(s) Sewer and Water
Sub-Category(s) Water Lines
Contracting Method Competitive Bids.
Project Status Results
Bids Due View project details and contacts
Estimated Value
Plans Available from
Owner View project details and contacts
Architect View project details and contacts
Description

The Work operates potable water distribution systems, reclaimed water distribution systems and sewer collection/transmission systems within its utilities service areas as depicted in Exhibit A, Service Area Map. Within the next six (6) months, the County has a planned need for installation of approximately 2,000 lineal feet of twelve inch (12”) High Density Polyethylene (HDPE) pipe via Horizontal Directional Drilling (HDD). Beyond this initial need, the County has an occasional need for HDD installation of various sizes of HDPE pipe on a planned basis and HDD installation of two inch (2”) and four inch (4”) Polyvinyl Chloride (PVC) conduit on an emergency basis.

Details

Division 33 - Utilities, Instrumentation and Control for Utilities, Water Utilities, Water Utility Distribution Piping, Water Utility Distribution Equipment, Disinfecting of Water Utility Distribution, Water Utility Storage Tanks.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents