Similar Projects
Plum Alley Waterline
Alteration
Design
$400,000 est. value
Pavillion, WY

Slip Line Sewer Lines for Quarters 22 and Quarters 17B
Infrastructure
Design
$25,000 to $100,000 est. value
Sheridan, WY 82801

Rehabilitate the Madison Junction Water Treatment and Spring Collection System
Infrastructure
Bidding
$1,000,000 to $2,000,000 est. value
Yellowstone National Park, WY 82190

Greys River Waterline Replacement
Infrastructure
Post-Bid
$400,000 est. value
Alpine, WY 83128

2021 McCollister Drive Water Main Replacement
Alteration
Post-Bid
Jackson, WY 83001

Leavitt Reservoir Expansion Project
New Construction, Infrastructure
Results
$40,000,000 to $50,000,000 est. value
Greybull, WY

Completion of Raw Water Reservoir
Infrastructure
Results
Green River, WY

Afton Elementary Fire Loop Waterline 2021
Alteration
Post-Bid
Afton, WY 83110

Derington Addition Watermain Replacements
Addition
Results
Casper, WY

Cottonwood Emergency Waterline Replacement
Infrastructure
Post-Bid
Edgerton, WY 82635

Rancher Complete Street Project
Infrastructure
Results
Jackson, WY 83001

2021 Water Sewer Rehabilitation Project
Infrastructure
Post-Bid
Albin, WY

AS/MB Meat Lab 136 Wash Down Piping Project
Infrastructure
Results
Laramie, WY 82072

Domestic Water Piping Replacement Project
Alteration
Post-Bid
Evanston, WY 82930

Caisson 2 Rehabilitation
Infrastructure
Results
Casper, WY 82604

Last Updated 07/01/2022 07:48 AM
Project Title

North Heights Waterline Replacement Project

Physical Address View project details and contacts
City, State (County) Sheridan, WY   (Sheridan County)
Category(s) Sewer and Water
Sub-Category(s) Water Lines
Contracting Method Competitive Bids.
Project Status Results
Bids Due View project details and contacts
Estimated Value $400,000 [brand] Estimate
Plans Available from
Owner View project details and contacts
Architect View project details and contacts
Description

The Base Bid includes the replacement of all ductile iron water mainline for Phase I of the North Heights Waterline Replacement project. Construction shall include a total of 1296 LF of 8" PVC Mainline, 1613 LF of 12" PVC mainline, 47 service connections, 4 connections into various sized mainlines, abandonment of the existing main and restoration of all surfacing to original conditions. Temporary water shall be supplied to residents at all times as well as traffic controls to ensure safe travel of local traffic.

Details

Division 33 - Utilities, Instrumentation and Control for Utilities, Water Utilities, Water Utility Distribution Piping, Water Utility Distribution Equipment, Disinfecting of Water Utility Distribution, Water Utility Storage Tanks.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents