Similar Projects
Warwick Health Sciences Academy - Renovations
Renovation, Infrastructure
Design
$700,000 CJ est. value
Newport News, VA 23601

Museum Drive Culverts and Replacement of Overlook
Infrastructure
Bidding
$200,000 CJ est. value
Newport News, VA 23601

Citywide Swale Repairs
Infrastructure
Bidding
$55,000 CJ est. value
Newport News, VA 23606

Virginia State University Academic Commons Building Project
Demolition, Renovation, Infrastructure - 174,000 SF
Post-Bid
$100,000,000 CJ est. value
Petersburg, VA 23803

RFP Construction Management at Risk - Construction Management at Risk for Construction of Integrated Science Center, Phase 3
New Construction, Infrastructure
Post-Bid
$46,000,000 CJ est. value
Newport News, VA 23606

Subgrade Stabilization
Infrastructure
Results

Glade Mountain / Killinger Creek Reclamation
Infrastructure
Results
$110,000 to $180,000 est. value

First Baptist Church
Renovation - 1,490 SF
Construction
Newport News, VA

Oyster Point Access Improvements- Ramps
Infrastructure
Bidding
$4,273,000 CJ est. value
Newport News, VA 23606

Blue Heron Landing Park
Infrastructure
Post-Bid
$775,000 CJ est. value
Chesapeake, VA 23325

Case Coal, Llc Bond Forfeiture
Alteration
Results
$110,000 to $180,000 est. value
Duffield, VA 24244

Denbigh High School Tennis Court Repair
Infrastructure
Post-Bid
$1,962,775 CJ est. value
Newport News, VA 23608

Multi-Use Trail Construction Projects
Infrastructure
Results
$400,000 CJ est. value
Hillsboro, VA 20132

Jefferson Avenue - Hudson Terrace to Main Street Resurfacing and Concrete Repairs Project
Infrastructure
Post-Bid
$480,000 CJ est. value
Newport News, VA 23606

Lucas Creek Pump Station Replacement
Demolition, New Construction, Infrastructure
Results
$19,285,068 CJ est. value
Newport News, VA 23602

Last Updated 10/04/2022 01:10 PM
Project Title

C.C Carter Funeral Home

Physical Address View project details and contacts
City, State (County) Newport News, VA 23607   (Newport News City County)
Category(s) Heavy and Highway, Religious/Funeral
Sub-Category(s) Religious Facility, Site Development
Contracting Method Bids by Invitation
Project Status Contract Award, Construction start expected October 2022
Bids Due View project details and contacts
Estimated Value $2,300,000 [brand] Estimate
Plans Available from
Owner View project details and contacts
Architect View project details and contacts
Description

As of September 29, 2022 Construction Documents have been completed. A general contractor has been selected. Construction is slated to begin October 2022, and complete within 8 to 9 months. *This project has been awarded and all trades have been let.

Details

8,540 SF.
Division 03 - Concrete, Concrete Forming, Cast-in-Place Concrete.
Division 04 - Masonry, Unit Masonry.
Division 06 - Wood, Plastics, and Composites, Rough Carpentry, Finish Carpentry, Architectural Woodwork, Ornamental Woodwork.
Division 07 - Thermal and Moisture Protection, Dampproofing and Waterproofing, Thermal Protection, Weather Barriers.
Division 08 - Openings, Doors and Frames, Windows, Hardware, Glazing.
Division 09 - Finishes, Plaster and Gypsum Board, Tiling, Ceilings, Flooring, Carpeting, Painting and Coating.
Division 10 - Specialties, Signage, Compartments and Cubicles, Toilet, Bath, and Laundry Accessories, Fire Protection Specialties.
Division 11 - Equipment, Religious Equipment.
Division 12 - Furnishings, Religious Art, Specialty Casework, Religious Casework, Fixed Audience Seating, Pews and Benches.
Division 21 - Fire Suppression, Instrumentation and Control for Fire-Suppression Systems, Water-Based Fire-Suppression Systems, Fire-Extinguishing Systems.
Division 22 - Plumbing, Instrumentation and Control for Plumbing, Plumbing Piping, Plumbing Equipment, Plumbing Fixtures, Drinking Fountains and Water Coolers.
Division 23 - Heating, Ventilating, and Air Conditioning (HVAC), Instrumentation and Control for HVAC, HVAC Air Distribution.
Division 26 - Electrical, Instrumentation and Control for Electrical Systems, Lighting, Interior Lighting, Emergency Lighting, Exit Signs, Exterior Lighting.
Division 27 - Communications, Structured Cabling, Voice Communications.
Division 28 - Electronic Safety and Security, Fire Detection and Alarm.
Division 31 - Earthwork, Grading, Excavation and Fill, Earthwork Methods, Soil Treatment.
Division 32 - Exterior Improvements, Flexible Paving, Rigid Paving, Fences and Gates, Irrigation, Planting, Turf and Grasses.
Division 33 - Utilities, Water Utilities, Sanitary Sewerage Utilities, Storm Drainage Utilities, Electrical Utilities, Communications Utilities.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents