Similar Projects
Morrison Ridge Shopping Center
New Construction, Infrastructure - 765,000 SF
Conception
$76,500,000 est. value
Concord, NC 28027

Coddle Creek Tributary Outfall Near Concord Parkway South - City of Concord
Infrastructure
Conception
$4,746,000 est. value
Concord, NC 28025

155 Biltmore Hotel
New Construction, Infrastructure
Design
$14,000,000 CJ est. value
Asheville, NC 28801

Case Farms addition / Morganton
Addition, Demolition, Infrastructure - 384 SF
Design
$300,000 CJ est. value
Morganton, NC 28655

Gray Fox Road Infrastructure Improvements
Infrastructure
Bidding
$600,000 CJ est. value
Havelock, NC 28532

Gray Fox Road Infrastructure Improvements
Infrastructure
Bidding
$600,000 CJ est. value
Havelock, NC 28532

RFP Design - Western Union County Center for Entrepreneurship
New Construction, Infrastructure
Post-Bid
$6,200,000 CJ est. value
Polkton, NC 28135

Resurface Various Streets 2022 Phase II
Infrastructure
Post-Bid
Fayetteville, NC 28314

Pedestrian Walkway - Phase III
Infrastructure
Results
$983,318 est. value
Trent Woods, NC

Us 17 Paving and Signals
Infrastructure
Results
NC

Long Shoals Road Multifamily
New Construction, Infrastructure
Construction
$33,000,000 CJ est. value
Arden, NC 28704

Long Shoals Road Multifamily
New Construction, Infrastructure
Construction
$33,000,000 CJ est. value
Arden, NC 28704

Fairhaven Summit Apartments
New Construction, Infrastructure
Pending Verification
$29,000,000 CJ est. value
Asheville, NC 28803

Compass Hotel / Beaufort
New Construction, Infrastructure
Pending Verification
$27,000,000 CJ est. value
Beaufort, NC 28516

Aviation Boulevard/Zephyr Place Connecting Road - City of Concord
Infrastructure
Conception
$3,400,000 est. value
Concord, NC

Reported 06/14/2023 12:00 AM
Project Title

Grandfather Mountain State Park - New Maintenance Area

Physical Address View project details and contacts
City, State (County) Banner Elk, NC 28604   (Avery County)
Category(s) Entertainment/Recreation, Heavy and Highway, Sewer and Water
Sub-Category(s) Maintenance, Misc. Recreational, Paving/Reconstruction, Sidewalks/Parking Lot, Site Development, Water Lines
Contracting Method Competitive Bids
Project Status Bidding,
Bids Due View project details and contacts
Estimated Value $1,577,000 [brand] Estimate
Plans Available from Agency's Affiliate
Owner View project details and contacts
Architect View project details and contacts
Description

https://coastalreview.org/2022/11/17m-to-go-to-state-park-improvements-land-acquisition/ $17M to go to state park improvements, land acquisition Pettigrew State Park in Washington and Tyrrell counties, about 75 miles northeast of Greenville, is to receive nearly $2 million for campground renovations through Parks and Recreation Trust Fund, or PARTF. The North Carolina Parks and Recreation Authority, which oversees PARTF, recently approved $17.4 million to fund nine capital improvement projects and six land acquisitions for North Carolina state parks, according to the N.C. Division of Parks and Recreation. The authority approved the funding during its meeting Nov. 4 at the North Carolina Arboretum in Asheville, the state announced Thursday. "These land acquisition and park improvement projects will both expand our state parks system and repair and restore facilities and trails for the benefit of the people of North Carolina as well as visitors to our state," N.C. Department of Natural and Cultural Resources Secretary D. Reid Wilson said in a statement. "We are grateful to the General Assembly and Governor Cooper for providing significantly increased investments in the Parks and Recreation Trust Fund over the last two years." In addition to the $1.94 million for campground renovations at Pettigrew State Park, other capital improvement projects funded through the program include historic building renovations at Carvers Creek and Hanging Rock state parks, upgraded sewer systems at Chimney Rock State Park, and development of a trailhead and trail construction along the Northern Peaks State Trail at Elk Knob State Park. Several of the approved projects will supplement Connect NC Bond projects at Carvers Creek, Grandfather Mountain, Pettigrew and Hanging Rock state parks. Connect N.C. Bond projects are state investments in public infrastructure such as state parks, community colleges and public safety. Funding approved for park planning projects will fund management plans for state parks and the State Comprehensive Outdoor Recreation Plan. Funding was also approved for repairs and renovations to state park facilities systemwide. A total of $2.1 million was approved for land acquisition at five state parks. These include 215 acres that will connect two tracts at Mount Mitchell State Park, and 58 acres to connect Elk Knob State Park to Peak Mountain. Amounts awarded and details on the projects are available online. ________________________ The project involves design and construction of a new park maintenance building with office, restroom, equipment repair area, woodworking area, and attached equipment storage building with lighting & electrical receptacles to house tractors, mowers, fire control equipment, lumber, etc. This project will also include a chain link security fence, road, parking, and all utilities. Total Project Budget $1,577,000 The method of Contractor Selection has not been Determined at this time

Details

Division 03 - Concrete, Concrete Forming and Accessories, Cast-in-Place Concrete.
Division 04 - Masonry, Unit Masonry.
Division 06 - Wood, Plastics, and Composites, Rough Carpentry, Finish Carpentry, Millwork.
Division 07 - Thermal and Moisture Protection, Dampproofing, Thermal Protection, Weather Barriers.
Division 08 - Openings, Entrances, Windows.
Division 09 - Finishes, Plaster and Gypsum Board, Ceilings, Flooring, Carpeting, Painting and Coating, Painting.
Division 12 - Furnishings.
Division 21 - Fire Suppression.
Division 22 - Plumbing.
Division 23 - Heating, Ventilating, and Air Conditioning (HVAC).
Division 26 - Electrical.
Division 27 - Communications.
Division 28 - Electronic Safety and Security.
Division 31 - Earthwork, Earthwork Methods.
Division 32 - Exterior Improvements, Operation and Maintenance of Exterior Improvements, Bases, Ballasts, and Paving, Flexible Paving, Asphalt Paving, Rigid Paving, Concrete Paving, Curbs, Gutters, Sidewalks, and Driveways.
Division 33 - Utilities, Instrumentation and Control for Utilities, Water Utilities, Water Utility Distribution Piping, Water Utility Distribution Equipment, Disinfecting of Water Utility Distribution, Water Utility Storage Tanks.
Division 34 - Transportation, Operation and Maintenance of Transportation.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents