Similar Projects
RFQ - United States Coast Guard (USCG) Disaster Reconstitution Multiple Award Construction Contract
Term Contract
Conception
$1,500,000 CJ est. value
Seattle, WA 98174

RFQ - United States Coast Guard (USCG) Disaster Reconstitution Multiple Award Construction Contract
Term Contract
Conception
$1,500,000 CJ est. value
Seattle, WA 98174

Redemption City Church
New Construction, Infrastructure - 34,000 SF
Design
$9,000,000 CJ est. value
Franklin, TN 37067

Carothers Pkwy Commercial
New Construction, Infrastructure
Design
$5,300,000 CJ est. value
Franklin, TN 37067

Bradfield Drive Flood Redirection Barrier
Infrastructure
Bidding
$405,000 CJ est. value
Nolensville, TN 37135

TOBSchool
New Construction, Infrastructure - 8,665 SF
Bidding
$2,000,000 CJ est. value
Franklin, TN 37064

Grand Boulevard Median Landscaping Project
Infrastructure
Sub-Bidding
$70,000 CJ est. value
Fairview, TN 37062

Grand Boulevard Median Landscaping Project
Infrastructure
Sub-Bidding
$70,000 CJ est. value
Fairview, TN 37062

TDOT Floating South Fire Hydrant
Infrastructure
Post-Bid
Franklin, TN 37064

SWC 504 Winter Road Maintenance
Term Contract
Post-Bid
$1,971,195 est. value

Modernization Upgrades - Elevators 1 & 2
Renovation
Results
Franklin, TN 37064

Boyd Mill - Callicott Transmission Main
Results
$3,900,000 est. value
Franklin, TN 37064

Ragsdale Road Improvements - Brentwood
Infrastructure
Pending Verification
$9,600,000 CJ est. value
Brentwood, TN 37027

Ragsdale Road Improvements - Brentwood
Infrastructure
Pending Verification
$9,600,000 CJ est. value
Brentwood, TN 37027

Church Street Infrastructure Improvement - City of Franklin
Infrastructure
Conception
$648,000 CJ est. value
Franklin, TN 37064

Last Updated 08/10/2022 08:45 AM
Project Title

Altitude Valve Replacement and Split Log Road Power Extension

Physical Address View project details and contacts
City, State (County) Brentwood, TN 37027   (Williamson County)
Category(s) Heavy and Highway, Sewer and Water
Sub-Category(s) Maintenance, Site Development, Water Lines
Contracting Method Competitive Bids
Project Status Construction start expected September 2022
Bids Due View project details and contacts
Estimated Value $481,700 [brand] Estimate
Plans Available from Municipal Agency
Owner View project details and contacts
Architect View project details and contacts
Description

This project includes the furnishing of all materials labor, tools, equipment, and appurtenances necessary for the installation of two (2) pre-fabricated altitude valve vaults at the City's Carriage Hills and Chenoweth Water Tank sites and underground power/fiber extension at the Split Log Water Tank site.

Details

Division 26 - Electrical.
Division 32 - Exterior Improvements, Operation and Maintenance of Exterior Improvements.
Division 33 - Utilities, Instrumentation and Control for Utilities, Water Utilities, Water Utility Distribution Piping, Water Utility Distribution Equipment, Disinfecting of Water Utility Distribution, Water Utility Storage Tanks.
Division 34 - Transportation, Operation and Maintenance of Transportation.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents