Similar Projects
2021 Asphaltic Concrete Pavement
Post-Bid
Reedsburg, WI 53959

Local Road Maintenance
Post-Bid
La Valle, WI

Airfield Paving Construction MATOC
Results
Less than $400,000,000 est. value

Asphaltic Paving
Results
Baraboo, WI

2021 Road Improvements
Post-Bid
WI

Reedsburg - Wisconsin Dells, N. Jct. STH 33 Intersection, Reedsburg -Wisconsin Dells, Copper Springs Road to N. Jct. STH 33, Reedsburg - Baraboo,N. Jct. STH 23 to USH 12
Results
Baraboo, Reedsburg, Wisconsin Dells, WI

Chip Sealing/ Pulverizing
Infrastructure
Post-Bid
North Freedom, WI

2021 Sycamore Street Reconstruction
Results
Sauk City, WI 53583

2021 Chip Seal
Infrastructure
Post-Bid
WI

2021 8th Street and North Dewey Reconstruction
Results
Less than $410,000 est. value
Reedsburg, WI 53959

2021 Crack Fill Project
Infrastructure
Post-Bid
WI

21st Street Extension
Results
Prairie du Sac, WI

Birchwood Road and Birchwood Spur Paving
Infrastructure
Post-Bid
Lake Delton, WI 53965

2021 Street Improvements
Results
Baraboo, WI

Road Projects for 2022
Infrastructure
Post-Bid
Lyndon Station, Reedsburg, WI 53965

Reported 07/06/2022 09:07 AM
Project Title

Wisconsin Dells - Baraboo Re - Ops for 6145-01-72

Physical Address View project details and contacts
City, State (County) Baraboo, WI   (Sauk County)
Category(s) Heavy and Highway
Sub-Category(s) Paving/Reconstruction
Contracting Method Competitive Bids.
Project Status Construction Documents, Construction Start Expected October 2022
Bids Due View project details and contacts
Estimated Value $250,000 to $500,000
Plans Available from
Owner View project details and contacts
Architect View project details and contacts
Description

Site work and paving for a road / highway in Baraboo, Wisconsin. Working plans call for site work for a road / highway; and for paving for a road / highway. Wisconsin Dells - Baraboo Cth a to Pilgrim Drive Re - Ops for 6145-01-72 State 3r Estimate Anticipated Funding $250,000 - $499,999 As of July 05, 2022, the project is in Final Planning status. Anticipated letting date is July 25, 2022. WisDOT - Wisconsin Dells - Baraboo Re - Ops for 6145-01-72 *Project information has been obtained through a public state transportation improvement plan (STIP). A STIP is a financial schedule for short- and long-range projects which is updated regularly. Information listed in the STIP often evolves based on funding availability. The project details, including timeline and value, are subject to change. The content management team will continue to pursue additional details as they become available. *The value for this project is based on a financial range. The value is listed as the highest possible cost from the range provided by a stakeholder or official project document.

Details

Division 01 - General Requirements, Vehicular Access and Parking, Traffic Control, Temporary Barriers and Enclosures.
Division 32 - Exterior Improvements, Flexible Paving, Asphalt Paving, Rigid Paving, Concrete Paving, Paving Specialties, Pavement Markings.
Division 33 - Utilities, Storm Drainage Utilities, Storm Drainage Structures.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents