Similar Projects
Bridgeland Central - Master Development
New Construction - 506,000 SF
Conception
Cypress, TX 77433

Kohl's
Renovation
Design
Mesquite, TX 75150

O'Reilly Auto Parts (LG4)
New Construction - 6,800 SF
Design
$500,000 est. value
League City, TX 77573

Abercrombie Kids
Renovation - 2,935 SF
Post-Bid
$250,000 est. value
The Woodlands, TX 77380

The Assembly
New Construction - 980,000 SF
Post-Bid
$10,000,000 CJ est. value
Dallas, TX 75226

Equipment Shop - Sweetwater MNT - Rebid
New Construction, Infrastructure
Results
$272,844 CJ est. value
Sweetwater, TX 79556

West Grove
New Construction - 393,300 SF
Construction
$10,000,000 CJ est. value
McKinney, TX 75078

Marketplace at Ninety-Six
New Construction - 10,153 SF
Construction
$750,000 est. value
League City, TX 77573

Lakeshore Plaza Mixed-Use Development
New Construction - 51,815 SF
Design
$5,000,000 to $10,000,000 CJ est. value
Little Elm, TX 75068

Kroger #435 Fuel Station
Renovation
Post-Bid
$1,500,000 est. value
Arlington, TX 76006

Gateway Village
New Construction - 14,400 SF
Construction
$1,000,000 to $5,000,000 CJ est. value
Denison, TX 75020

Five Below - Shell Upgrades
Build-Out - 10,226 SF
Design
Austin, TX 78748

JCPenney #0702 - Vertical Transportation
Renovation - 800 SF
Post-Bid
$400,000 est. value
El Paso, TX 79925

O'Reilly Auto Parts (RD3)
New Construction - 7,885 SF
Construction
$650,000 est. value
Richmond, TX 77406

Heritage Ranch - Phase 2-4
New Construction, Infrastructure
Design
$100,000,000 CJ est. value
Sherman, TX 75092

Last Updated 07/10/2023 11:05 AM
Project Title

Ulta Beauty - Brenham Center / Brenham

Physical Address View project details and contacts
City, State (County) Brenham, TX 77833   (Washington County)
Category(s) Commercial
Sub-Category(s) Retail
Contracting Method Bids by Invitation
Project Status Bidding, Construction start expected August 2023
Bids Due View project details and contacts
Estimated Value $490,000 [brand] Estimate
Plans Available from Selected Bidders
Owner View project details and contacts
Architect View project details and contacts
Description

This is a tenant improvement of an existing 7,500 sq ft space. There is no nightwork. *The owner requests that all subcontractor / supplier inquiries be directed to the GC Bidder.

Details

1 Story Above Grade, 7,500 SF.
Division 01 - General Requirements, Construction Facilities, Field Offices and Sheds, Sanitary Facilities, Construction Aids, Temporary Scaffolding and Platforms.
Division 03 - Concrete, Concrete Forming, Concrete Accessories, Concrete Reinforcing, Cast-in-Place Concrete, Structural Concrete.
Division 04 - Masonry, Unit Masonry.
Division 05 - Metals, Structural Metal Framing, Structural Steel Framing, Structural Steel for Buildings, Steel Joist Framing.
Division 06 - Wood, Plastics, and Composites, Rough Carpentry, Finish Carpentry, Millwork.
Division 07 - Thermal and Moisture Protection, Dampproofing and Waterproofing, Sheet Metal Waterproofing, Thermal Insulation, Weather Barriers, Built-Up Bituminous Roofing, Flashing and Sheet Metal, Joint Sealants.
Division 08 - Openings, Metal Frames, Metal Doors, Wood Doors, Plastic Doors, Special Function Doors, Cold Storage Doors, Panel Doors, Sectional Doors, Entrances and Storefronts, Entrances, Automatic Entrances, Sliding Automatic Entrances, Windows, Door Hardware.
Division 09 - Finishes, Plaster and Gypsum Board, Gypsum Board, Tiling, Acoustical Ceilings, Flooring, Painting and Coating, Painting, Exterior Painting, Interior Painting.
Division 10 - Specialties, Signage, Telephone Specialties, Compartments and Cubicles, Fire Protection Specialties, Fire Protection Cabinets, Fire Extinguishers, Storage Assemblies, Metal Storage Shelving.
Division 11 - Equipment, Loading Dock Equipment.
Division 12 - Furnishings, Casework, Rugs and Mats, Office Furniture, Site Furnishings, Trash and Litter Receptacles.
Division 21 - Fire Suppression, Instrumentation and Control for Fire-Suppression Systems, Fire-Extinguishing Systems.
Division 22 - Plumbing, Plumbing Piping, Facility Water Distribution, Plumbing Equipment, Plumbing Fixtures, Commercial Plumbing Fixtures, Drinking Fountains and Water Coolers.
Division 23 - Heating, Ventilating, and Air Conditioning (HVAC), HVAC Insulation, Instrumentation and Control for HVAC, HVAC Air Distribution.
Division 26 - Electrical, Instrumentation and Control for Electrical Systems, Power Distribution Units, Interior Lighting, Emergency Lighting, Exit Signs, Exterior Lighting, Lighting Poles and Standards, Parking Lighting, Area Lighting, Site Lighting, Flood Lighting.
Division 27 - Communications, Structured Cabling, Data Communications, Voice Communications, Distributed Audio-Video Communications Systems, Paging Systems.
Division 28 - Electronic Safety and Security, Electronic Access Control and Intrusion Detection, Access Control, Electronic Surveillance, Video Surveillance, Fire Detection and Alarm.
Division 31 - Earthwork, Site Clearing, Grading, Soil Treatment.
Division 32 - Exterior Improvements, Bases, Ballasts, and Paving, Flexible Paving, Asphalt Paving, Rigid Paving, Concrete Paving, Curbs, Gutters, Sidewalks, and Driveways, Paving Specialties, Parking Bumpers, Pavement Markings, Fences and Gates, Planting Irrigation, Planting.
Division 33 - Utilities, Water Utilities, Sanitary Sewerage Utilities, Storm Drainage Utilities.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents