Similar Projects
Transfer Station Concrete
Bidding
Darlington, SC 29540

River Sand Top Dressing for Athletic Fields
Bidding
Rock Hill, SC 29732

Stone Academy Safe RTS to School
Post-Bid
SC

Rip Rap, Crusher Run, Sand- Clarendon
Term Contract
Post-Bid
Manning, SC 29102

Application of Calcium Chloride on Roads
Term Contract
Results
New Ellenton, SC 29809

FLBC or Crush and Run
Results
SC

Rock Crushing
Bidding
Orangeburg, SC 29118

Purchase of Public Works Materials
Post-Bid
Kingstree, SC 29556

Purchase of 10,000 Tons of Limestone Crusher Run (FLBC)
Results
Moncks Corner, SC 29461

#57 Stone, #4 Stone and 1.5" Granite Crusher Run for Webb and Palachucola WMA's
Post-Bid
Columbia, SC

Crushing of Concrete/Asphalt
Results
Less than $94,900 est. value
Conway, SC 29528

Stone (Various)
Term Contract
Post-Bid
Darlington, SC

Rock (Granite) and FLBC (Limestone) C-Fund Road Construction
Results
SC

Rock and Delivery
Post-Bid
Liberty, Pickens, SC

4 Ballast Stone, Per Ton Price Including Delivery
Results
Gresham, SC 29546

Reported 02/25/2020 12:00 AM
Project Title

Grading and Crushed Rock

Physical Address View project details and contacts
City, State (County) Summerville, SC 29483   (Dorchester County)
Category(s) Heavy and Highway
Sub-Category(s) Aggregates
Contracting Method Competitive Bids.
Project Status Request for Quotations
Bids Due View project details and contacts
Estimated Value
Plans Available from County Agency
Owner View project details and contacts
Architect View project details and contacts
Description

Install crushed rock at the Carters property. The project scope includes the following 1. Grade existing base to proper depth 2. Add and grade area highlighted in red (appx 37,000 SF) with 2” of crush and run 3. In areas highlighted in gray, create a solid base of 6” crush and run for new mobile units to sit upon (6890 SF) 4. Install new drain bed around mobile units in areas highlighted in light blue (500 LF) 5. Install new swales in areas highlighted in dark blue between mobile units 6. Ensure surface is finished to the County’s satisfaction 7. Remove all debris left over. 8. Any change orders not in the scope or agreed upon prior to work beginning must be approved before it is started. 9. All work must meet all electrical and building code standards

Details

Division 31 - Earthwork, Common Work Results for Earthwork, Aggregates for Earthwork.
Division 32 - Exterior Improvements, Common Work Results for Exterior Improvements, Aggregates for Exterior Improvements.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents