Similar Projects
Pilibos Improvements - PC00185 - City of Fresno
Infrastructure
Conception
$910,200 CJ est. value
Fresno, CA 93727

South Tower Park - PC00204 - City of Fresno
Infrastructure
Conception
$2,071,000 CJ est. value
Fresno, CA 93721

Cape Seal Project (Measure N)
Term Contract
Design
Visalia, CA

Lakeshore Stewardship IRSC
Infrastructure
Design
$150,000 CJ est. value
Prather, CA 93651

RFQ D/B - Sanger Fire Station Remodel
Addition, Demolition, Build-out, Renovation, Infrastructure - 12,050 SF
Bidding
$7,000,000 CJ est. value
Sanger, CA 93657

Remove AC Pavement, Widen Travel Way, and Construct Retaining Wall
Infrastructure
Bidding
$13,500,000 CJ est. value
Fresno, CA 93726

CA NPS PP SEKI 2018(3) CA NPS PP SEKI 2020(1) Pavement Preservation Lassen Seki Phase I and Pavement Preservation Seki Phase II
Term Contract
Post-Bid
Fresno, Sequoia National Park, CA

California Conservation Corps (CCC) Auberry Residential Center - CA Department of General Services
Addition, Demolition, New Construction, Build-out, Infrastructure
Post-Bid
$52,000,000 CJ est. value
Auberry, CA 93602

Fancher Creek Trail
Infrastructure
Results
$669,877 est. value
CA

Lincoln Avenue Cold Pavement Recycling
Infrastructure
Results
$11,875,000 to $12,125,000 est. value
Clovis, CA 93630

7-Eleven #1042810 / Fresno
New Construction, Infrastructure - 3,131 SF
Pending Verification
$850,000 CJ est. value
Fresno, CA 93702

7-Eleven #1042810 / Fresno
New Construction, Infrastructure - 3,131 SF
Pending Verification
$850,000 CJ est. value
Fresno, CA 93702

Bulldog and Sixth Building Community Center - PC00212 - City of Fresno
New Construction, Renovation, Infrastructure
Conception
$1,200,500 CJ est. value
Fresno, CA 93710

Manila Highway 255 Shared Use Path
Alteration
Post-Bid
$888,055 est. value

Tamarack Sno-Park Repaving
Term Contract
Results
$250,000 to $500,000 est. value
Shaver Lake, CA 93664

Last Updated 09/06/2022 07:31 PM
Project Title

Herndon Widening Polk to Milburn - PW00679 - City of Fresno

Physical Address View project details and contacts
City, State (County) Fresno, CA 93612   (Fresno County)
Category(s) Heavy and Highway
Sub-Category(s) Maintenance, Paving/Reconstruction, Site Development
Contracting Method Competitive Bids
Project Status Design Development, Construction start expected February 2023
Bids Due View project details and contacts
Estimated Value $22,503,800 [brand] Estimate
Plans Available from
Owner View project details and contacts
Architect View project details and contacts
Description

Herndon Widening Polk to Milburn A detailed scope has not yet been determined This project is included in the City of Fresno's FY 2023-2027 Capital Improvement Plan (CIP). Per the owner, as of September 6, 2022, a design team has been selected. The owner states that construction will not start until the winter of 2023. Owner states that the project has not bid and therefore they do not have a general contractor yet. *Project information has been obtained through a public capital improvement plan (CIP). A CIP is a financial schedule for short- and long-range projects which is updated regularly. Information listed in the CIP often evolves based on funding availability and the project details, including timeline and value, are subject to change. The content management team will continue to pursue additional details as they become available.

Details

Division 32 - Exterior Improvements, Operation and Maintenance of Exterior Improvements.
Division 34 - Transportation, Operation and Maintenance of Transportation.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents