Similar Projects
2.822 Miles of Widening and Reconstruction on SR 20 Beginning at Scott Road (CR 28) and Extending to Union Hill Road (CR 762)
Infrastructure
Bidding
Canton, GA 30115

Paving Bids
Infrastructure
Bidding
Collins, Reidsville, GA 30421

Dual Turn at Ridge Walk Parkway and Main Street Intersection
Post-Bid
Woodstock, GA 30188

Design-Build Services for Statewide ITS Dynamic Messaging Signs (DMS) Deployment
Post-Bid

Southern Region Disaster Recovery Support BPA
Results

2020 LMIG Asphalt Resurfacing Project
Results
Holly Springs, GA 30115

Oakmulgee Ranger District Road Maintenance
Post-Bid
$2,500 to $5,000,000 est. value

2020 SPLOST Street Repairs
Results
Less than $1,451,535 est. value
Canton, GA 30114

T32-D6-Ppv-Mill-Inlay-Cherokee-122079
Infrastructure
Post-Bid
GA

Westside Drive Roadway Improvements
Results
Acworth, GA 30101

LMIG Roadway Resurfacing Project-Deer Run North
Results
Less than $166,981 est. value
Woodstock, GA 30188

Holly Court Drainage Repairs
Results
Acworth, GA 30101

Rope Mill Road Resurfacing Cardinal Drive to Angela Court
Results
Less than $309,855 est. value
Woodstock, GA 30188

2020 Resurfacing Project
Results
Less than $2,992,177 est. value
Canton, GA 30114

Ridgewalk Parkway at Main Street Intersection Improvements
Results
Less than $81,400 est. value
Woodstock, GA 30188

Last Updated 08/18/2021 08:30 AM
Project Title

Hub Transformation Project

Physical Address View project details and contacts
City, State (County) Woodstock, GA   (Cherokee County)
Category(s) Heavy and Highway
Sub-Category(s) Highway Signs/Guardrails/Barriers, Paving/Reconstruction, Shoreline/Erosion/Drainage, Sidewalks/Parking Lot
Contracting Method Competitive Bids.
Project Status Results
Bids Due View project details and contacts
Estimated Value
Plans Available from
Owner View project details and contacts
Architect View project details and contacts
Description

The work to be done consists of the furnishing of all materials, labor, and equipment for the complete construction of the Hub Transformation Project, hereinafter referred to as the “PROJECT”, including, but not limited to, erosion control, maintenance of traffic, paving, grading, excavation, subgrade preparation, drainage construction, wall construction, concrete surface course, sidewalks, signs, pavement marking, and grassing at locations indicated in the plan set.

Details

Division 01 - General Requirements, Vehicular Access and Parking, Traffic Control, Temporary Barriers and Enclosures.
Division 03 - Concrete.
Division 31 - Earthwork, Erosion and Sedimentation Controls, Earthwork Methods.
Division 32 - Exterior Improvements, Bases, Ballasts, and Paving, Flexible Paving, Asphalt Paving, Rigid Paving, Concrete Paving, Curbs, Gutters, Sidewalks, and Driveways, Paving Specialties, Pavement Markings.
Division 33 - Utilities, Storm Drainage Utilities, Ponds and Reservoirs, Storm Drainage Structures.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents