Similar Projects
$MUNI-CIP-Treatment Plant Exp-biosolids-city of Woodland
Infrastructure
Conception
$5,716,000 CJ est. value
Woodland, CA 95695

MUNI-CIP-Water Pollution Asset Replacement-city of Woodland
Infrastructure
Conception
$3,002,119 CJ est. value
Woodland, CA 95695

I Street Bridge Replacement / Sacramento
New Construction, Infrastructure
Design
$210,000,000 est. value
West Sacramento, CA 95605

River II
New Construction, Infrastructure - 1,500 SF
Design
$50,000,000 CJ est. value
West Sacramento, CA 95605

Grocery Outlet / Winters
New Construction, Infrastructure - 16,000 SF
Bidding
$4,300,000 CJ est. value
Winters, CA 95694

Grocery Outlet / Winters
New Construction, Infrastructure - 16,000 SF
Bidding
$4,300,000 CJ est. value
Winters, CA 95694

California Conservation Corps (CCC) Auberry Residential Center - CA Department of General Services
Addition, Demolition, New Construction, Build-out, Infrastructure
Post-Bid
$52,000,000 CJ est. value
Auberry, CA 93602

Manila Highway 255 Shared Use Path
Alteration
Post-Bid
$888,055 est. value

HMA Concrete Grinder Dig out Repair and Replacement Paving
Infrastructure
Results
CA

Place polyester concrete overlay
Infrastructure
Results
$2,050,000 est. value

Bretton Woods
New Construction, Infrastructure
Construction
$190,000,000 CJ est. value
Davis, CA 95616

Bretton Woods
New Construction, Infrastructure
Construction
$190,000,000 CJ est. value
Davis, CA 95616

Dutch Bros Coffee - Ikea Court / West Sacramento
New Construction, Infrastructure - 950 SF
Pending Verification
$287,000 CJ est. value
West Sacramento, CA 95605

Dutch Bros Coffee - Ikea Court / West Sacramento
New Construction, Infrastructure - 950 SF
Pending Verification
$287,000 CJ est. value
West Sacramento, CA 95605

MUNI-CIP-Replacement Orangeberg Sewer Laterals-city of Woodland
Infrastructure
Conception
$2,035,000 CJ est. value
Woodland, CA 95695

Last Updated 04/15/2023 01:33 AM
Project Title

HSIP Florin Road Signal & Safety Improvements Project

Physical Address View project details and contacts
City, State (County) Woodland, CA 95695   (Yolo County)
Category(s) Heavy and Highway
Sub-Category(s) Maintenance, Paving/Reconstruction, Site Development
Contracting Method Competitive Bids
Project Status Results, Construction start expected June 2023
Bids Due View project details and contacts
Estimated Value $6,368,032 [brand] Estimate
Plans Available from Agency's Affiliate
Owner View project details and contacts
Architect View project details and contacts
Description

Project Duration 150 Working Days The HSIP Florin Road Signal and Safety Improvements Project proposes to replace traffic signal heads, upgrade pedestrian signal heads with countdown signal heads, install new signal poles, mast arms, and other equipment, remove pedestal mounted signal poles and equipment from medians, install pedestrian signals, reconstruct frontage road islands, reconstruct medians, install pedestrian fencing in medians, and reconstruct curb ramps. The project also proposes to install emergency vehicle preemption systems and replace controller cabinets. For information regarding the DBE Program, contact Jose Ledesma at jledesma@cityofsacramento.org DBE GOAL FOR THIS PROJECT IS SET AT 22% Minor property acquisition may be required to complete the proposed work. To evaluate if hazardous waste conditions are present at the project site, Crawford implemented the following scope of work. Discussed proposed improvements for the Florin Road Traffic Signal Improvement Project Review documentation available of the State of Californias GeoTracker website for indications of possible impact adjacent to the project sites. Collected soil samples from up to four locations at each project site to evaluate soil lead concentrations and pH; Collected samples of the existing concrete flatwork from up to four locations at each project site to evaluate if asbestos in present in the concrete Sampling approach for this project was based on the City of Sacramento plan set titled, Improvement Plans for Florin Road HSIP Project dated December 18, 2020, supplied by GPA. Services for this project were completed in accordance with TO#5-T15185800, dated April 17, 2019.

Details

Division 32 - Exterior Improvements, Operation and Maintenance of Exterior Improvements.
Division 34 - Transportation, Operation and Maintenance of Transportation.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents