Similar Projects
Croton Avenue to Maple Row - Water Main Extension
Infrastructure
Bidding
Cortlandt Manor, NY 10567

2022 Water Maintenance Materials
Term Contract
Bidding
Peekskill, NY

Couplings and Valves
Post-Bid
White Plains, NY 10601

Hydrant Replacement
Post-Bid
Briarcliff Manor, NY 10510

Croton-on-Hudson Water District Infrastructure Improvements Project
Results
Croton-on-Hudson, NY 10520

4610--VHA Mar Cor Reverse Osmosis Water Purification BNOE | Sources Sought | 36U10120Q0029
Results

2021 Water Maintenance Materials
Term Contract
Post-Bid
Peekskill, NY 10566

Covert Street Water Main Replacement
Results
Cortlandt Manor, NY 10567

Emergency Response for Water Main Repairs
Post-Bid
Montrose, NY 10548

Sherwood Road-Water Main Replacement
Results
Cortlandt Manor, NY 10567

Water Main Work
Post-Bid
Buchanan, NY

Control Valve
Results
White Plains, NY 10601

Plug Valves
Alteration
Post-Bid
NY

Emergency/Priority Repair/Replacement/Installation of Water Mains, Water Service Connections, Fire Hydrants and Other Appurtenances
Term Contract
Results
Harrison, Mamaroneck, New Rochelle, Rye, Rye Brook, Yonkers, NY

Smart AMI Water Meter System
Infrastructure
Post-Bid
Yorktown, NY

Last Updated 11/18/2021 09:50 AM
Project Title

Governors Office of Storm Recovery, Blind Brook, Stream Monitoring System at SUNY Purchase

Physical Address View project details and contacts
City, State (County) Harrison, Rye, NY   (Westchester County)
Category(s) Sewer and Water
Sub-Category(s) Water Lines
Contracting Method Competitive Bids.
Project Status Results
Bids Due View project details and contacts
Estimated Value $500,000 to $600,000
Plans Available from
Owner View project details and contacts
Architect View project details and contacts
Description

The project consists of the installation of 2 stream monitoring systems, one upstream and one downstream of the Bowman Pond Dam. The stream monitoring systems consist of the installation of a cast in place concrete caisson, supporting a steel frame that supports the stream monitoring system, which consists of a water level sensor and rain gauge. The project occurs at 2 locations an upstream and a downstream location as follows: The upstream location is near the intersection of Lincoln Avenue and Brookside Way in Rye Brook, New York. The downstream location is near the intersection of Wappanocca Avenue and Natoma Street in Rye New York.

Details

Division 27 - Communications, Common Work Results for Communications.
Division 28 - Electronic Safety and Security, Common Work Results for Electronic Safety and Security.
Division 33 - Utilities, Instrumentation and Control for Utilities, Water Utilities, Water Utility Distribution Piping, Water Utility Distribution Equipment, Disinfecting of Water Utility Distribution, Water Utility Storage Tanks.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents