Similar Projects
Avery Point Academic Building Roof Replacement Avery Point Campus Project
Post-Bid
Storrs, CT

Fine Arts - Roof Replacement
Post-Bid
Less than $1,000,000 est. value
Storrs, CT

Roof Replacement - Hall Memorial Library
Results
Less than $168,820 est. value
Ellington, CT

Andover Museum Roof Replacement Project
Results
Less than $10,000 est. value
Andover, CT

On-Call Trade Roofing Contractor Program
Post-Bid
$100,000 to $500,000 est. value
Storrs, CT

Andover Department of Public Works Re-Roofing
Results
Andover, CT

National Roofing Program (NRP) Design/Build 99th
Post-Bid

The Roof Replacement of the Willington Repair Facility.
Results
$500,000 to $999,999 est. value
Willington, CT

National Roofing Program (NRP) Design/Build Nationwide
Post-Bid

North Residence Halls Roof Refurbishment PH II
Results
Less than $1,146,000 est. value
Storrs, CT 06269

Gampel Pavilion Dome Ceiling and Roof Repair Bulletin #2
Renovation
Post-Bid
Storrs, CT 06269

Roofing And Siding Repairs
Results
Vernon, CT 06066

Citizens Block Hazardous Waste Remediation, Selective Demolition and Roof Replacement 28-34 Park Place
Post-Bid
Rockville, Vernon, CT 06066

Roof Replacement at Andover Public Works Facility
Results
Less than $53,000 est. value
Andover, CT 06232

MATOC - Army Reserve National Roofing Program (NRP)
Post-Bid
Less than $95,000,000 est. value

Last Updated 02/27/2019 12:14 PM
Project Title

Screening Information Request/Request for Offer Replace an Existing Roof Located at Snow Hill Rd., Union, CT.

Physical Address View project details and contacts
City, State (County) Union, CT   (Tolland County)
Category(s) Single Trades
Sub-Category(s) Roofing
Contracting Method Competitive Bids.
Project Status Results
Bids Due View project details and contacts
Estimated Value $10,000 to $70,000
Plans Available from Federal Agency
Owner View project details and contacts
Architect View project details and contacts
Description The Contractor will remove and dispose of, in accordance with local laws, the existing roofing and any other necessary materials. Materials are presumed asbestos containing materials. - The Contractor will be responsible to repair any collateral damage during the demolition and construction phases of the project. - The Contractor will remove existing roofing down to wood deck and dispose. - The Contractor will install one layer of 1.5" polyisocyanurate roof insulation. - The contractor will install Sarnafil S327 72mil RhinoBond system (color - white.) - The contractor will Fabricate and install new sarnaciad metal drip edge with new aluminum fascia. - The contractor will provide a twenty-year Sarnafil warranty.
Details
Division 07 - Thermal and Moisture Protection, Dampproofing and Waterproofing, Thermal Protection.
Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents