Similar Projects
Central Region AE IDIQ
New Construction, Term Contract
Design
$25,000,000 est. value

Contractor - Lead Private Service Line Replacement Program
Infrastructure
Design
Shorewood, WI

RFQ - Engineering and Professional Services at Milwaukee Mitchell International Airport (MKE)
Term Contract
Bidding
Milwaukee, WI 53207

RFP - Annual Emergency Generator Servicing and Testing at System Wide - Various Locations
Term Contract
Bidding
Milwaukee, WI 53202

Project Engineering and Design Services for New Chilled Water Plant
New Construction, Alteration
Post-Bid
Milwaukee, WI

Preliminary Engineering - Siphons-Phase 1
Term Contract
Post-Bid
Milwaukee, WI

Water Tank Inspections, OCONUS and CONUS
Results
$10,000 to $5,000,000 est. value

NGB Fire Protection - National Architect and Engineering Indefinite Delivery Indefinite Quantity Contract
Results
$70,000 to $10,000,000 est. value
Washington, DC

UWMIL Central Heating Plant Chiller Replacement
Renovation
Design
$13,360,000 CJ est. value
Milwaukee, WI 53202

RFP - Rail Corridor Safety Study Grant
Term Contract
Bidding
Milwaukee, WI 53202

Preliminary Engineering - Siphons-Phase 1
Infrastructure
Post-Bid
Milwaukee, WI

National Architecture/Engineering/Interiors (IDIQ) Contract
Results
Less than $25,000,000 est. value

RFP - IH 894 and IH 43
Term Contract
Bidding
West Allis, WI 53214

Engineering Services - Dredged Material Management Facility
Infrastructure
Post-Bid
Milwaukee, WI

Indefinite Delivery Indefinite Quantity Architectural-Engineering Contracts
Results

Last Updated 01/06/2023 03:09 PM
Project Title

RFP Engineering - Perpetuation - STH 241 from W Elm Road to W Villa Drive - Pavement Replacement

Physical Address View project details and contacts
City, State (County) Oak Creek, WI 53154   (Milwaukee County)
Category(s) Professional Services
Sub-Category(s) Engineering
Contracting Method Competitive Bids
Project Status Conceptual Design, Construction start expected October 2023 , Request For Proposals
Bids Due View project details and contacts
Estimated Value $4,000,000 [brand] Estimate
Plans Available from State Agency
Owner View project details and contacts
Architect View project details and contacts
Description

As of January 6, 2023, this project is in the conceptual phase. An engineer has been selected but not awarded. Although a firm timeline for construction has not been determined, construction is not expected to start prior to October 2023. *The closed solicitation has been included below for reference: Transportation Region/Bureau: Southeast Region Solicitation ID: SE-07 Anticipated Construction Cost: $3,000,000-$3,999,999 Route : STH 241N County : 40 - Milwaukee County Limit : W Elm Road to W Villa Drive The pavement needs replacement. Perpetuation project to replace approximately 6 miles of STH 241 from W Elm Road to W Villa Drive within the City of Oak Creek, in Milwaukee County. Signals may be updated as needed. Curb ramps will be evaluated those out of compliance will be reconstructed to standard or documented as technically infeasible. Spot repairs to curb & gutter and islands will be investigated The contract price will be based on an estimate of the selected consultant's actual costs plus fixed fee. Actual costs will be defined as those costs allowable under the cost principles in Part 31 of Federal Acquisition Regulation (FAR) Consultant costs including indirect cost rates and cost accounting system will be subject to audit. Consultant firms that are unable to account for costs consistent with requirements of the FAR are not eligible to contract. Consultants selected will be required to either submit or have on file with WisDOT a Consultant Financial Report prior to contract execution. Information on the report may be found electronically Advertised Fixed Fee %: 7.25 The fixed fee for this contract will apply an indirect cost factor of 150% to the consultant's estimated direct labor, regardless of the consultant's actual indirect rate. Interview: Interviews will not be conducted The method of contractor selection has not been determined at this time. WisDOT - RFP Engineering - Perpetuation - Pavement Replacement *The value for this project is based on a financial range. The value is listed as the highest possible cost from the range provided by a stakeholder or official project document.

Details

Division 31 - Earthwork.
Division 32 - Exterior Improvements.
Division 33 - Utilities.
Division 34 - Transportation.
Division 35 - Waterway and Marine Construction.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents