Similar Projects
Saws Water Well Mitigation Program
Bidding
Less than $95,000 est. value
San Antonio, TX 78212

Saws Water Well Mitigation Program
Bidding
Less than $95,000 est. value
San Antonio, TX 78212

Contract for the Purchase of a Submersible Pump
Post-Bid
San Antonio, TX

Well No. 2 Replacement
Post-Bid
Anthony, TX

Plugging Abandoned Water Well
Results
$1,320 est. value
Irving, TX

Saws Water Well Mitigation Program
Results
Less than $97,000 est. value
San Antonio, TX

Pumps, Pump Parts, Pump Overhaul Repair Services
Term Contract
Bidding
TX

Rehabilitation of Well No. 3A
Post-Bid
$125,000 est. value
Kilgore, TX 75662

Water Well No. 4 at Water Plant No. 1
Results
Less than $1,450,000 est. value
TX

Well Pump Rehabilitation
Bidding
The Colony, TX

High Service Pump Repair
Post-Bid
Athens, TX 75751

Ground Water Well Rehabilitation Various Sites
Results
$2,639,083 est. value
Houston, TX 77000

Vertical Turbine Pump Repair
Bidding
Dallas, TX 75212

Water Well No. 1 Replacement at Water Plant No. 1
Post-Bid
Less than $3,500,000 est. value
Houston, TX

Construction of Well Collection Line
Results
$300,000 est. value
Richmond, TX 77406

Last Updated 04/28/2021 07:27 AM
Project Title

Water Well No. 1 Rehabilitation

Physical Address View project details and contacts
City, State (County) Houston, TX   (Brazoria County)
Category(s) Sewer and Water
Sub-Category(s) Pumps and Wells
Contracting Method Competitive Bids.
Project Status Results
Bids Due View project details and contacts
Estimated Value
Plans Available from
Owner View project details and contacts
Architect View project details and contacts
Description

Work of the contract consists in providing mobilization of sufficient workforce, equipment and supervision to complete the construction of Water Well No. 1 Rehabilitation for Remington Municipal Utility District No. 1. Contractor shall review the entirety of the contract documents for the full details of the work involved. The rehabilitation work generally includes but is not limited to: providing bonds and insurance; pulling and hauling the existing pump bowl assembly, column assembly, discharge header, and pump motor to contractor’s shop for inspection; performing video survey & providing written report on the condition of the well, column assembly, pump bowl assembly, discharge header and pump motor; performing any necessary mechanical and/or chemical rehabilitation of the well; re-installation of pump bowl assembly, column assembly, pump motor and discharge header; well disinfection, bacteriological sampling and well production test; together with all related subsidiary and incidental components for a complete and operational system.

Details

Division 02 - Existing Conditions, Subsurface Investigation.
Division 03 - Concrete, Cast-in-Place Concrete.
Division 22 - Plumbing, Plumbing Piping, Plumbing Equipment.
Division 26 - Electrical, Instrumentation and Control for Electrical Systems.
Division 33 - Utilities, Water Utilities, Water Utility Distribution Piping, Water Utility Distribution Equipment, Water Utility Pumping Stations, Wells.
Division 44 - Pollution and Waste Control Equipment, Water Pollution Control Equipment.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents