Similar Projects
Last Updated | 06/08/2021 12:23 PM |
Project Title | Arnold Hall Stormwater Improvements |
Physical Address | View project details and contacts |
City, State (County) | Lees Summit, MO (Jackson County) |
Category(s) | Sewer and Water |
Sub-Category(s) | Storm/Sewers |
Contracting Method | Competitive Bids. |
Project Status | Results |
Bids Due | View project details and contacts |
Estimated Value | |
Plans Available from | |
Owner | View project details and contacts |
Architect | View project details and contacts |
Description | Extension of the existing storm systems along Green Street and 3rd Street. This includes the following approximate quantities: 200 feet of storm sewer pipe and 3 structures located south of the commercial properties on 3rd Street, running to the east, and tying into the existing 36-inch pipe along the west side of Green Street, 133 feet of storm sewer pipe, 4 structures, approximately 31,100 cubic feet of underground stormwater storage tanks, and 1,868 cubic yards of clean rock starting at roughly the NE corner of the property at 110 SE 4th Street running to the north and connecting to the existing system along 3rd Street, and possible sanitary sewer and/or water service line relocation. Final restoration to include approximately 15,195 square feet of permeable pavers, curb and gutter, concrete paving, and sod. |
||||
Details |
|
||||
Bidder's List | View project details and contacts | ||||
Prospective Bidders | View project details and contacts | ||||
Project Documents |
![]() Engineered Spec Sheet ![]() Architectural Plans ![]() Other Documents |