Similar Projects
Groundwater Alliance Package No 5
Infrastructure
Post-Bid
Gresham, OR

Tainter Pump Rebuild
Alteration
Post-Bid
The Dalles, OR

Gresham Deep Drywell Pilot Project
Infrastructure
Post-Bid
Gresham, OR

Last Updated 02/01/2022 06:59 PM
Project Title

Kellogg Creek Water Resource Recovery Facility Influent Pump 2 and 4 Replacement

Physical Address View project details and contacts
City, State (County) Milwaukie, OR 97222   (Clackamas County)
Category(s) Sewer and Water
Sub-Category(s) Pumps and Wells
Contracting Method Competitive Bids.
Project Status Results
Bids Due View project details and contacts
Estimated Value $1,342,000
Plans Available from
Owner View project details and contacts
Architect View project details and contacts
Description

Demolition of existing Pumps 2 and 4, associated piping and pump pedestals. Demolition of two existing VFDs. Demolition of an old transformer and removal of connected cabling. Base bid shall assume the transformer does not contain polychlorinated biphenyl (PCBs) o Additive bid item assumes the transformer does contain PCBs and comprises the additional cost to dispose of the transformer in accordance with the authorities having jurisdiction. Installation of two new influent pumps, motors, pedestals, and associated piping. Installation of electrical gear, control panels, instruments, and VFDs.

Details

Division 02 - Existing Conditions, Subsurface Investigation.
Division 03 - Concrete, Cast-in-Place Concrete.
Division 22 - Plumbing, Plumbing Piping, Plumbing Equipment.
Division 26 - Electrical, Instrumentation and Control for Electrical Systems.
Division 33 - Utilities, Water Utilities, Water Utility Distribution Piping, Water Utility Distribution Equipment, Water Utility Pumping Stations, Wells.
Division 44 - Pollution and Waste Control Equipment, Water Pollution Control Equipment.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents