Similar Projects
St. Lucie County Fire District Stations 10 & 15 Concrete & Drainage Rehabilitation
Bidding
Fort Pierce, FL 34953

Portofino Shores Lake Bank Restoration
Post-Bid
$484,650 to $530,510 est. value
Fort Pierce, FL

Ten Mile Creek Oxbow Restoration
Results
Fort Pierce, FL

Canal Maintenance
Results
Fort Pierce, FL 34945

Tilton Road Drainage Improvement Project
Results
Fort Pierce, FL 34945

Fort Pierce Inlet Artificial Reef Construction
Results
Fort Pierce, FL 34982

Summit Street at NSLRWCD Canal 8 Culvert Replacement
Results
$180,000 est. value
Fort Pierce, FL 34982

McCarty Ranch Extension Water Quality Restoration Construction Project - Area 3
Results
Less than $2,000,000 est. value
Port Saint Lucie, FL 34984

Park and Ride Lots
Results
Less than $2,718,616 est. value
FL

Drainage Repairs and Improvements
Results
Less than $200,000 est. value

Emergency Dune Restoration and Miscellaneous Beach Services
Term Contract
Results
Fort Pierce, FL 34982

Emergency Debris Removal/Dike Repair
Results
Fort Pierce, FL 34982

Shore Protection Project, Beach Rennourishment 2021, Ft Pierce, St, Lucie County, Florida
Results
$5,000,000 to $10,000,000 est. value
Fort Pierce, FL GROUP118

Immokolee Road at FPFWCD Canal 5 Culvert Replacement
Results
$1,000,000 est. value
Fort Pierce, FL 34982

Construction of the Sagamore Storm Water Treatment Areas - East and West
Results
Less than $1,890,000 est. value
Port Saint Lucie, FL 34983

Last Updated 02/21/2020 08:04 AM
Project Title

E-3 Canal Improvements - Phases 1 and 2 Construction Project

Physical Address View project details and contacts
City, State (County) Port Saint Lucie, FL 34984   (Saint Lucie County)
Category(s) Heavy and Highway
Sub-Category(s) Shoreline/Erosion/Drainage
Contracting Method Competitive Bids.
Project Status Results
Bids Due View project details and contacts
Estimated Value $5,200,000
Plans Available from
Owner View project details and contacts
Architect View project details and contacts
Description

The project included in the E-3 Canal Improvements project is the installation of piping, drainage manholes and inlets, concrete endwalls, earthwork, riprap stabilization measures, pre-construction and post-construction videos, participation in a public informational meeting and other necessary activities as depicted in the Approved for Construction plans titled “E-3 Canal Improvements” prepared by Wantman Group, Inc. (WGI) consisting of pages 1 – 82 and Technical Specifications consisting of pages 1 - 13. Additional items include sodding of all disturbed areas, clearing and grubbing as depicted in the Approved for Construction Plans, hauling and disposal of unsuitable materials, turf reinforcement mats, providing construction and as-built surveys, installation of stormwater protection measures including but not limited to silt fences and turbidity curtains, and complying with all permits, including but not limited to the Army Corps of Engineers and the South Florida Water Management District permits for this project, and obtaining an NPDES and Dewatering permit as necessary. The Contractor will also be responsible for any costs with and coordination associated with obtaining the right to utilize private properties, bordering or in close proximity, to the project area for site access and construction activities/staging required to construct a complete product as depicted in the Approved for Construction Plans. City Staff may be available to help in the coordination efforts between the Contractor and private property owners.

Details

Division 31 - Earthwork, Erosion and Sedimentation Controls.
Division 33 - Utilities, Storm Drainage Utilities, Ponds and Reservoirs.
Division 35 - Waterway and Marine Construction, Shoreline Protection, Waterway Construction and Equipment.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents