Similar Projects
RFP D/B - USCG National Multiple Award Construction Contract (NMACC III)
Term Contract
Post-Bid
$25,000,000 CJ est. value
Seattle, WA 98174

2022 Exploratory Drilling AML
Term Contract, Infrastructure
Post-Bid

Advanced Metering Infrastructure
Infrastructure
Results
$1,032,671 est. value

McClusky Water Tower
Infrastructure
Results
$2,280,000 est. value
Turtle Lake, ND

Gate Valve Replacement
Infrastructure
Post-Bid
$900,400 CJ est. value
Riverdale, ND 58565

Water Improvement District 2021-1 Pump House and Reservoir Improvements
Renovation, Alteration
Results
$475,000 est. value
Bismarck, Coleharbor, ND

RFQ Construction Manager at Risk - Improvements - Renovations and/or Additions to Existing School Facilities
Addition, Demolition, Renovation, Infrastructure
Post-Bid
$1,000,000 CJ est. value
Washburn, ND 58577

2022 Garrison Phase 5 AML
Infrastructure
Results
Garrison, ND

RFQ Construction Management - White Shield Son of Star Casino
New Construction, Infrastructure
Post-Bid
$18,000,000 CJ est. value
White Shield, ND 58540

2022 Street and Utility Improvements
Infrastructure
Results
$1,905,462 CJ est. value
Wilton, ND 58579

Northwest Area Water Supply (NAWS) Project
Renovation, Infrastructure
Post-Bid
$600,000 CJ est. value
Coleharbor, ND 58531

BFEP - Pipelines
Alteration
Results
$800,000 est. value
Turtle Lake, ND

DeTrobriand Bay Marina Marina Improvements - Phase 1
Infrastructure
Post-Bid
$1,945,105 CJ est. value
Garrison, ND 58540

Reclamation of the Wells - Package 1
Infrastructure
Results
$525,159 CJ est. value
Turtle Lake, ND 58575

2023 Street and Utility Improvements
Infrastructure
Post-Bid
$275,000 CJ est. value
Wilton, ND 58579

Last Updated 04/26/2023 12:02 PM
Project Title

Fort Stevenson State Park Master Lift Station Replacement

Physical Address View project details and contacts
City, State (County) Garrison, ND 58540   (McLean County)
Category(s) Heavy and Highway, Sewer and Water
Sub-Category(s) Lift and Pump Stations, Site Development, Water Lines
Contracting Method Competitive Bids
Project Status Results, Construction start expected January 2023
Bids Due View project details and contacts
Estimated Value $362,737 [brand] Estimate
Plans Available from Civil Engineer
Owner View project details and contacts
Architect View project details and contacts
Description

As of April 26, 2023, the project has not been awarded. A timeline for award has not been confirmed. Generally, the Work covered by the Plans and Specifications for Fort Stevenson State Park Master Lift Station Replacement consists of the materials, labor, tools, and equipment required for the construction of a sanitary sewer lift station. The Work includes the removal and replacement of a sanitary sewer lift station, a sanitary sewer manhole, approximately 66 LF of gravity sanitary sewer, approximately 51 LF of force main, and other incidentals as necessary to complete the project. Details of the construction are included in the Drawings and Project Manual. All Bids must be submitted, and all work shall be done, in full and strict compliance with: 1. The Plans & Contract Documents for this project; 2. Any Special Conditions for this project; All Bids are to be submitted on the basis of cash payment for the Work and Materials necessary to complete the project. Each bid must be accompanied by a separate envelope containing the contractor's license and bid security. The bid security must be in a sum equal to five percent of the full amount of the bid and must be in the form of a bidder's bond. A bidder's bond must be executed by the bidder as principal and by a surety, conditioned that if the principal's bid is accepted and the contract awarded to the principal, the principal, within ten days after notice of the award, shall execute a contract in accordance with the terms of the bid and the bid bond and any condition of the governing body. A countersignature of a bid bond is not required under this section. If a successful bidder does not execute a contract within the ten days allowed, the bidder's bond must be forfeited to the Owner and the project awarded to the next lowest responsible bidder. Bidders must be licensed for the full amount of the bid as required by section 43-07-12 of the North Dakota Century Code. No Bid may be read or considered if it does not fully comply with the requirements of Section 48-01.2-05 of the North Dakota Century Code. The Owner reserves the right to hold all Bids for 30 days, to reject any or all Bids, to waive any informality or irregularity in any Bid, to accept the Bid deemed in the best interest of the Owner, and to rebid the project until a satisfactory bid is received. There shall be endorsed upon the outside of the envelope containing the Bid, the following: 1. "Fort Stevenson State Park Master Lift Station Replacement" 2. The name of the person, firm, corporation, or joint venture submitting the Bid. 3. The Bidder's Contractor's License or Contractor's License Renewal Number. 4. Acknowledgement of the Addenda, if any. Any deficient Bid received will be resealed and returned to the Bidder immediately. Should the Contractor fail to complete its obligations under the Contract within the time required herein or within such extra time as may have been granted by formal extensions of time approved by the Owner, there will be deducted from any amount due to the Contractor the sum of $1,000 per day for each and every calendar day that the completion of the Work is delayed. The Contractor and his Surety will be liable for any excess. Such payment will be as and for liquidated damages and not as a penalty. By order of the State of North Dakota Department of Parks and Recreation. Potential bidders may contact Ackerman-Estvold at (701) 837-8737 with any questions.

Details

Division 03 - Concrete.
Division 04 - Masonry.
Division 05 - Metals.
Division 06 - Wood, Plastics, and Composites.
Division 07 - Thermal and Moisture Protection.
Division 08 - Openings.
Division 09 - Finishes.
Division 10 - Specialties, Signage, Toilet, Bath, and Laundry Accessories, Fire Protection Specialties, Fire Extinguishers, Storage Specialties.
Division 11 - Equipment.
Division 12 - Furnishings.
Division 14 - Conveying Equipment, Scaffolding.
Division 21 - Fire Suppression.
Division 22 - Plumbing.
Division 23 - Heating, Ventilating, and Air Conditioning (HVAC).
Division 26 - Electrical.
Division 27 - Communications, Data Communications, Voice Communications, Audio-Video Systems.
Division 28 - Electronic Safety and Security.
Division 31 - Earthwork.
Division 32 - Exterior Improvements, Fences and Gates, Turf and Grasses.
Division 33 - Utilities, Common Work Results for Utilities, Instrumentation and Control for Utilities, Water Utilities, Water Utility Distribution Piping, Water Utility Distribution Equipment, Water Utility Pumping Stations, Disinfecting of Water Utility Distribution, Water Utility Storage Tanks, Wastewater Utility Pumping Stations, Sanitary Utility Sewerage Force Mains.
Division 40 - Process Integration, Water Process Piping.
Division 45 - Industry-Specific Manufacturing Equipment.
Division 46 - Water and Wastewater Equipment.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents