Similar Projects
New DRS & Gas Main at PW
New Construction
Conception
$250,000 CJ est. value
Waukee, IA 50263

Gas Main Line - Waukee
Build-out
Conception
$500,000 CJ est. value
Waukee, IA 50263

Premier Tech Office
New Construction - 15,739 SF
Design
$7,000,000 est. value
Urbandale, IA 50322

Northwest 88th Street Office Building
New Construction - 8,861 SF
Design
Less than $2,000,000 est. value
Johnston, IA 50131

Phase 2 Project Linn County Secondary Roads District #1 Shop
New Construction, Infrastructure - 26,871 SF
Bidding
$3,500,000 CJ est. value
Palo, IA 52324

North West Area Education Agency Off Renovation
Renovation - 78,401 SF
Post-Bid
$500,000 CJ est. value
Sioux City, IA 51111

Keokuk CSD High School Music Wing Addition and Secure Entry
Renovation, Addition - 11,000 SF
Post-Bid
Keokuk, IA 52632

CED Office Remodel
Renovation
Results
Davenport, IA

Holiday Park Baseball Improvements Phase 6A Maintenance Building Renovation
Renovation
Results
$190,826 est. value
West Des Moines, IA 50265

Mid American Dsm Service Center
Renovation - 119,555 SF
Construction
Des Moines, IA 50320

Johnston Town Center Mixed-Use
New Construction, Infrastructure - 13,500 SF
Construction
$3,000,000 CJ est. value
Johnston, IA 50131

Hilltop Campus Village
New Construction
Pending Verification
$500,000 est. value
Davenport, IA 52803

Second Street Office Improvements
Renovation - 18,936 SF
Pending Verification
Des Moines, IA 50309

Civic Campus / Waukee
New Construction, Infrastructure
Conception
$2,576,500 CJ est. value
Waukee, IA 50263

Smith + Frieberg Office Renovation And Addition
Renovation, Addition
Design
$500,000 est. value
Des Moines, IA 50312

Last Updated 11/07/2022 10:04 AM
Project Title

Office Renovation, West Monona C.S.D.

Physical Address View project details and contacts
City, State (County) Onawa, IA 51040   (Monona County)
Category(s) Commercial
Sub-Category(s) Office
Contracting Method Competitive Bids
Project Status Contract Award, Construction start expected May 2023
Bids Due View project details and contacts
Estimated Value $1,012,000 [brand] Estimate
Plans Available from Copy Center
Owner View project details and contacts
Architect View project details and contacts
Description

The project consists of remodeling of existing high school and central office space into a high school office and remodeling of former middle school office space and a classroom into central office space. The project also includes replacement of the existing middle school and high school fire alarm system. Project location is at the Middle School/High School Building, 1314 15th Street, Onawa, Iowa, 51040 Demolition and renovation of the high school office and the district office located at the West Monona High School Building. A more detailed description of the kinds and approximate quantities of materials and types of construction for which bids will be received are set forth in the Bidding Documents prepared by CMBA Architects, which, together with the proposed form of contract, have heretofore been tentatively approved by the Board of Directors of the West Monona Community School District, subject to public hearing, and are now on file for public examination at the District's Administration Office located at 1314 15th Street, Onawa, Iowa and are by this reference made part hereof as though fully set out and incorporated herein. All sealed bids in connection therewith shall be submitted to the Board of Directors of the West Monona Community School District on or before the time herein set for letting. All proposals shall be made on official proposal forms furnished by the Architect/Engineer and must be enclosed in a separate sealed envelope and plainly identified and addressed to the West Monona Community School District. If a bid is to be mailed, the bid envelope shall be sealed in a regular mailing envelope. FAX and E-mail Bids will not be accepted. The Owner reserves the right to reject any or all bids and to waive informalities as allowed by law and to hold and consider the bids for 30 days after the date of the bid opening. The contract will be awarded to the lowest, responsive, responsible bidder meeting specifications. Each proposal shall be accompanied by a bid bond, certified check, cashier's check or certified share draft in a separate sealed envelope, clearly marked "Bid Bond" or Bid Security", in an amount equal to five percent (5%) of the total amount of the proposal. The certified or cashier's check shall be drawn on a bank in Iowa or a bank chartered under the laws of the United States of America or the certified share draft shall be drawn on a credit union in Iowa or chartered under the laws of the United States and payable to the West Monona Community School District. Said check or share draft may be cashed, or the bid bond forfeited as liquidated damages in the event the successful bidder fails or refuses to enter into a contract within ten (10) days of issuance of a Notice of Award and post bond satisfactory to the School District insuring the faithful fulfillment of the contract and maintenance of said improvements as required by law. The bid bond should be executed by a corporation authorized to contract as a surety in the State of Iowa and must not contain any conditions either in the body or as an endorsement thereon. The successful bidder will be required to furnish performance and payment bonds in an amount equal to one hundred percent (100%) of the contract price, said bond to be issued by a responsible surety approved by the Board of Directors of the West Monona Community School District of Onawa, Iowa, and shall guarantee the faithful performance of the contract and the terms and conditions therein contained, the payment for labor and materials used in the project and the maintenance of said improvements in good repair for not less than one (1) year from the time of acceptance of said improvements by the Board of Directors of the West Monona Community School District. Payment of the cost of said project will be made from such cash funds of the West Monona Community School District as may be legally used for said purpose at the discretion of the West Monona Community School District. In accordance with Iowa statutes, a resident bidder shall be allowed a preference as against a nonresident bidder from a state or foreign country if that state or foreign country gives or requires any preference to bidders from that state or foreign country, including but not limited to any preference to bidders, the imposition of any type of labor force preference, or any other form of preferential treatment to bidders or laborers from that state or foreign country. The preference allowed shall be equal to the preference given or required by the state or foreign country in which the nonresident bidder is a resident. In the instance of a resident labor force preference, a nonresident bidder shall apply the same resident labor force preference to a public improvement in this state as would be required in the construction of a public improvement by the state or foreign country in which the nonresident bidder is a resident. All bidders shall provide a statement regarding the bidder's resident status. This statement shall be on the Bidder Status Form designated by the Iowa Department of Labor Commissioner and available on-line. Failure to submit a fully completed Bidder Status Form with the bid may result in the bid being deemed nonresponsive and rejected. The Contractor will be paid ninety-five per cent (95%) of the Architect's/Engineer's estimate of the value of acceptable work completed at the end of the preceding month. Final payment will be made not less than thirty-one (31) days after completion of the work and acceptance by the Board of Directors of the West Monona Community School District, subject to the conditions of and in accordance with the provisions of Chapter 573 of the Code of Iowa. No such final payment will be due until the Contractor certifies to the Board of Directors of the West Monona Community School District that the materials, labor, and services involved in the final estimate have been completed and paid for in accordance with the requirements stated in the specifications. The West Monona Community School District of Onawa, Iowa is exempt from paying Sales and Use Tax and will supply Contractor with an "Iowa Sales Tax Exemption Certificate" and an authorization letter to allow the Contractor to buy equipment and material for the project without paying Sales and Use tax. The work shall commence per the Bidding and Construction Schedule after receipt by the contractor of a written notice to proceed and shall be substantially completed on or before the 11th day of August 2023, subject to any changes in the contract period as provided for in these specifications and granted by the Board of Directors. The Work on shall be finally completed by, and ready for final payment, on or before the 18th day of August 2023, subject to any changes in the contract period as provided for in these specifications and granted by the Board of Directors of the West Monona Community School District. Plans and specifications governing the construction of the proposed improvements have been prepared by the Architect/Engineer. These plans and specifications, and the proceedings of the Board of Directors of the West Monona Community School District referring to and defining said improvements, are hereby made a part of this Notice and the proposed contract by reference, and the proposed contract shall be executed to comply therewith. Copies of said plans and specifications and form of contract are now on file in the Superintendent's Office of the West Monona Community School District, for examination by bidders. All bids will be governed by applicable provisions in the Iowa Code and West Monona Community School District, including its Non-Discrimination Equal Employment Opportunity and Affirmative Action Policy. By virtue of statutory authority, a preference will be given to products and provisions grown and coal produced within the State of Iowa.

Details

Division 03 - Concrete, Concrete Forming, Cast-in-Place Concrete, Precast Concrete.
Division 04 - Masonry, Unit Masonry.
Division 05 - Metals, Structural Metal Framing.
Division 06 - Wood, Plastics, and Composites, Rough Carpentry, Finish Carpentry, Millwork.
Division 07 - Thermal and Moisture Protection, Dampproofing and Waterproofing, Thermal Protection, Weather Barriers.
Division 08 - Openings, Doors and Frames, Entrances and Storefronts, Windows.
Division 09 - Finishes, Plaster and Gypsum Board, Tiling, Acoustical Ceilings, Flooring, Carpeting, Painting.
Division 10 - Specialties, Signage, Compartments and Cubicles, Toilet Compartments, Fire Protection Specialties, Fire Protection Cabinets, Fire Extinguishers.
Division 12 - Furnishings, Window Treatments, Casework, Rugs and Mats, Office Furniture.
Division 21 - Fire Suppression.
Division 22 - Plumbing, Plumbing Piping, Facility Water Distribution, Facility Sanitary Sewerage, Plumbing Equipment, Plumbing Fixtures, Drinking Fountains and Water Coolers.
Division 23 - Heating, Ventilating, and Air Conditioning (HVAC), Instrumentation and Control for HVAC, HVAC Piping and Pumps, HVAC Air Distribution.
Division 26 - Electrical, Power Distribution Units, Interior Lighting, Emergency Lighting, Exit Signs, Exterior Lighting.
Division 27 - Communications, Structured Cabling, Data Communications, Voice Communications.
Division 28 - Electronic Safety and Security, Electronic Access Control and Intrusion Detection, Electronic Detection and Alarm.
Division 31 - Earthwork, Clearing and Grubbing, Grading, Soil Treatment.
Division 32 - Exterior Improvements, Base Courses, Flexible Paving, Asphalt Paving, Rigid Paving, Concrete Paving, Curbs, Gutters, Sidewalks, and Driveways, Paving Specialties, Parking Bumpers, Pavement Markings, Fences and Gates, Irrigation, Planting.
Division 33 - Utilities, Water Utilities, Sanitary Sewerage Utilities, Storm Drainage Utilities, Electrical Utilities.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents