Similar Projects
Mill Valley Flex Buildings
New Construction
Conception
Cape Coral, FL 33991

Billy Bowlegs Recreation Facility - City of Fort Myers
New Construction, Infrastructure
Conception
$3,000,000 CJ est. value
Fort Myers, FL 33905

The Homes at 81 West
New Construction, Infrastructure
Design
$2,000,000 CJ est. value
Fort Myers, FL 33912

Skyline Boulevard Retail
New Construction, Infrastructure - 4,000 SF
Design
$1,000,000 CJ est. value
Cape Coral, FL 33914

RFP D/B - US 41 Over Caloosahatchee River Bridge #120002
Infrastructure
Bidding
$26,046,845 CJ est. value
Villas, FL 33907

Wawa #5237 / Fort Myers
New Construction, Infrastructure - 6,421 SF
Post-Bid
$1,400,000 CJ est. value
Fort Myers, FL 33912

Artificial Reef Construction 2022
Infrastructure
Post-Bid
$137,465 CJ est. value
Cape Coral, FL 33909

Construction Of Unimproved Alleys
New Construction, Infrastructure
Results
$600,000 est. value
Cape Coral, FL 33909

Southeast Lee County Test and Observation Wells
Infrastructure
Results
$2,544,975 CJ est. value
Fort Myers, FL 33901

Porsche / Fort Myers
Demolition, New Construction, Infrastructure - 67,632 SF
Construction
$700,000 CJ est. value
Fort Myers, FL 33913

RFP D/B - Design and Construction of Zone 3 - WEG HQ/Maintenance Hangar and Apron Facilities
New Construction, Infrastructure - 211,419 SF
Construction
$195,651,603 CJ est. value
Tyndall AFB, FL 32403

Cape Coral Yacht Club Renovations - City of Cape Coral
Infrastructure
Pending Verification
$60,000,000 CJ est. value
Cape Coral, FL 33904

RV One Superstore of Fort Myers
New Construction, Infrastructure - 30,000 SF
Pending Verification
$6,750,000 CJ est. value
Fort Myers, FL 33905

Kelly Road Multi-Residential Development
New Construction, Infrastructure
Conception
$22,000,000 CJ est. value
Fort Myers, FL 33908

Project Rainforest Warehouse Distribution
New Construction - 649,653 SF
Design
Fort Myers, FL 33905

Last Updated 02/13/2023 06:06 PM
Project Title

Estero Island Emergency Berm

Physical Address View project details and contacts
City, State (County) Fort Myers Beach, FL 33931   (Lee County)
Category(s) Heavy and Highway, Industrial/Manufacturing
Sub-Category(s) Industrial Warehouse, Site Development
Contracting Method Competitive Bids
Project Status Contract Award, Construction start expected March 2023
Bids Due View project details and contacts
Estimated Value $7,559,840 [brand] Estimate
Plans Available from Municipal Agency
Owner View project details and contacts
Architect View project details and contacts
Description

There is no planned pre-bid meeting. The project will be built in strict compliance with the plans and specifications in the Contract Documents. The Town of Fort Myers Beach seeks to contract with a qualified Contractor to purchase, transport, place, and grade an estimated 125,170 tons (89,406 cubic yards X 1.4 conversion) of beach compatible sand within an Emergency Berm along the central and south segments of Estero Island, Fort Myers Beach, FL 33931. All work shall be conducted in accordance with the Florida Department of Environmental Protections Hurricane Ian Emergency Final Orders and subsequent revisions and / or amendments. The scope is further defined and detailed within the Plans, Technical Specifications and General Conditions associated with this project. Contractor is responsible for reviewing all documentation associated with this project. All work performed shall follow all Federal, State, Local, OSHA and department mandated regulations and specifications for associated work. The CONTRACTOR agrees to perform all the work necessary to complete all items listed below. The OWNER has the right to accept or reject any or all part of a submitted bid. This project requires the Contractor to be licensed and insured in the State of Florida. The Town of Fort Myers Beach reserves the right, in its sole judgment in the best interest of the Town of Fort Myers Beach, to waive any informalities in any bids; to make award(s) including multiple awards; to waive any non-substantive, in Towns sole judgment, irregularity or technicality in bids received, and/or to reject any or all bids. The TOWN will require a Bid Bond and a Public Construction Bond on this project. If required, a Public Construction Bond (on Form No. FMB:007 provided in (Part E) issued in a sum equal to one hundred (100%) percent of the total awarded contract amount by a surety company considered satisfactory by Fort Myers Beach and otherwise authorized to transact business in the State of Florida shall be required from the successful BIDDER DESCRIPTION OF WORK AND LOCATIONS a. The work on this contract generally consists of the following: i. Mobilization/Demobilization ii. Purchase beach compatible sand from an approved inland sand mine iii. Preparing construction accesses and staging areas iv. Providing maintenance of traffic v. Conducting construction stake-outs and surveys vi. Transporting, placing, and grading sand within Emergency Berm templates vii. Restoring all staging, access, and/or material handling areas b. The work shall be performed in accordance with the approved construction documents. All materials and shop drawings shall be submitted for review by the Engineer of Record. c. Additional work may be requested by the Town to be performed as negotiated based on pricing provided in this bid, as well as other items as deemed commensurate for the requested scope of work. d. The location of the project is the dry beach along Estero Island within the Town of Fort Myers Beach, Lee County, Florida. Please refer to plans for further location information

Details

Division 03 - Concrete, Concrete Forming, Cast-in-Place Concrete, Precast Concrete.
Division 04 - Masonry, Unit Masonry.
Division 05 - Metals, Structural Metal Framing.
Division 06 - Wood, Plastics, and Composites.
Division 07 - Thermal and Moisture Protection, Dampproofing and Waterproofing, Thermal Protection, Weather Barriers.
Division 08 - Openings, Doors and Frames, Coiling Doors and Grilles, Windows.
Division 09 - Finishes.
Division 10 - Specialties, Signage, Fire Protection Specialties.
Division 11 - Equipment, Loading Dock Equipment, Loading Dock Bumpers, Stationary Loading Dock Equipment, Portable Dock Equipment, Loading Dock Lights.
Division 21 - Fire Suppression, Instrumentation and Control for Fire-Suppression Systems.
Division 22 - Plumbing, Instrumentation and Control for Plumbing.
Division 26 - Electrical, Instrumentation and Control for Electrical Systems, Interior Lighting, Emergency Lighting, Exit Signs, Exterior Lighting, Lighting Poles and Standards, Parking Lighting, Flood Lighting.
Division 27 - Communications.
Division 31 - Earthwork, Site Clearing, Clearing and Grubbing, Grading.
Division 32 - Exterior Improvements, Bases, Ballasts, and Paving, Flexible Paving, Rigid Paving, Curbs, Gutters, Sidewalks, and Driveways, Paving Specialties, Pavement Markings, Fences and Gates, Screening Devices.
Division 33 - Utilities, Water Utilities, Sanitary Sewerage Utilities, Storm Drainage Utilities.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents