Similar Projects
Libbey Parkway Replacement Well Implementation - General Bids
Infrastructure
Bidding
Weymouth, MA

Caisson Well Redevelopment
Infrastructure
Bidding
$17,000 est. value
Hamilton, MA 01982

Libbey Parkway Well Implementation - Filed Sub Bids
Infrastructure
Sub-Bidding
Weymouth, MA 02189

Cleaning, Redevelopment and Chemical Treatment of Gravel Packed Wells
Post-Bid
Less than $82,000 est. value
Walpole, MA

Well No. 3 Upgrades - General Bids
Post-Bid
Less than $750,000 est. value
Littleton, MA

Heather Row Grinder Pump (Furnish and Install)
Results
$225,000 est. value
Tewksbury, MA

GP 1 Replacement Well Implementation - General Bids
Results
$350,000 est. value
Seekonk, MA

Cyr Street Wells No 4 and No 5 Improvements
Alteration
Bidding
$200,000 est. value
West Bridgewater, MA 02379

Backwash Pump VFD Project
Post-Bid
Walpole, MA 02081

Decommissioning of a Former Water Well
Results
$15,000 to $25,000 est. value
Huntington, MA

Multi-Year Well Cleaning and Redevelopment for FY 2022 to FY 2024
Infrastructure
Bidding
$100,000 est. value
Chelmsford, MA

Dewatering Pump Restoration and Maintenance Service, Diesel Powered
Post-Bid
Charlestown, MA

Construction of Two Gravel-Packed Wells for Municipal Water Supply, and Decommissioning of Four Municipal Wells
Results
$475,000 est. value
South Dartmouth, MA 02748

Well Cleaning 2 and 8 Redevelopment
Post-Bid
Sudbury, MA

Morse Pond Replacement Well Field
Results
$198,462 est. value
Natick, MA

Last Updated 11/02/2021 10:36 AM
Project Title

Redevelopment of Furnace Brook Well No 2 and Replacement of Well Pumping Unit

Physical Address View project details and contacts
City, State (County) Marshfield, MA 02050   (Plymouth County)
Category(s) Sewer and Water
Sub-Category(s) Pumps and Wells
Contracting Method Competitive Bids.
Project Status Results
Bids Due View project details and contacts
Estimated Value $50,000
Plans Available from Engineer
Owner View project details and contacts
Architect View project details and contacts
Description

Details

Division 02 - Existing Conditions, Subsurface Investigation.
Division 09 - Finishes, Painting.
Division 22 - Plumbing, Plumbing Piping, Plumbing Equipment.
Division 26 - Electrical, Instrumentation and Control for Electrical Systems.
Division 33 - Utilities, Water Utilities, Water Utility Distribution Piping, Water Utility Distribution Equipment, Water Utility Pumping Stations, Wells.
Division 44 - Pollution and Waste Control Equipment, Water Pollution Control Equipment.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents