Similar Projects
Secondary Building Roof and Awning Repair and Replacement
Bidding
Dove Creek, CO

Deck and Stair Repairs
Post-Bid
Snowmass Village, CO 81615

Historic Courthouse Stone Masonry
Post-Bid
Walsenburg, CO

Lone Tree Golf Clubhouse Exterior
Results
$150,000 to $200,000 est. value
Lone Tree, CO

Bear Park Phase III - Climate Battery and Dome Functionality
Results
Glenwood Springs, CO 81601

Exterior Restoration and Rehabilitation
Construction
Saguache, CO 81149

Re-Plaster and Re-Tile The Bob Burger Recreation Center Lap Pool
Post-Bid
Lafayette, CO

Remediate Campus Fall Hazards, Phase 1 and Phase 2
Results
$800,000 est. value
Golden, CO 80401

Julesburg Rest Area EIFS Repair and Window Replacement
Post-Bid
Less than $160,000 est. value
Julesburg, CO 80737

Cu Den Bldg 1St Replace Main Doors
Results
Denver, CO

Buffalo Run Golf Course Club House Stair Railing Replacement
Post-Bid
Commerce City, CO

Exterior Stair Replacement - Timberline PK-8
Results
Longmont, CO 80504

Woodman Hall Exterior Egress Stair Replacement Project
Post-Bid
Fountain, CO 80817

Nottingham Park Pavilion Water Proofing Repair Project
Results
Avon, CO 81620

Paired Panel Operable Wall Partitions
Post-Bid
Glenwood Springs, CO 81601

Last Updated 06/23/2020 12:00 AM
Project Title

Rabbit Ears Pass Siding

Physical Address View project details and contacts
City, State (County) CO   (Grand County)
Category(s) Single Trades
Sub-Category(s) Finishes/Exterior
Contracting Method Competitive Bids.
Project Status Bidding
Bids Due View project details and contacts
Estimated Value $75,000
Plans Available from State Agency
Owner View project details and contacts
Architect View project details and contacts
Description

Qualified General Contractors (GCs) are invited to bid on the removal and replacement of spray-foam insulation and the addition of metal siding at an existing Vehicle Storage Facility (VSF) at CDOT’s Rabbit Ears Pass maintenance facility. The existing facility is a single story 6,600 square foot masonry building with existing spray foam insulation applied to the exterior of the building. This project includes removing that insulation, applying new closed-cell spray foam insulation, and installing new metal siding with wood framing backup and a concrete curb.

Details

Division 07 - Thermal and Moisture Protection, Thermal Insulation, Sprayed Insulation, Siding, Steel Siding.
Division 09 - Finishes.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents