Similar Projects
Leeds Connector - 459-320 - City of Sioux City
Infrastructure
Conception
$250,000 est. value
Sioux City, IA

Riverside Boulevard Military Road District Plan - 879-019 - City of Sioux City
Infrastructure
Conception
$1,200,000 est. value
Sioux City, IA 51109

29th Street Reconstruction (Jones Street to Cheyenne Boulevard)
Infrastructure
Design
$6,150,000 CJ est. value
Sioux City, IA 51104

29th Street Reconstruction (Jones Street to Cheyenne Boulevard)
Infrastructure
Design
$6,150,000 CJ est. value
Sioux City, IA 51104

Thompson Park Improvements Project
Infrastructure
Bidding
$567,000 CJ est. value
Sioux City, IA 51101

Thompson Park Improvements Project
Infrastructure
Bidding
$567,000 CJ est. value
Sioux City, IA 51101

Des Moines River Basin, Saylorville Lake Roads, Trails and Infrastructure Maintenance IDIQ
Term Contract
Post-Bid
$25,000,000 CJ est. value
Johnston, IA 50131

Moville 2nd Street Overlay
Infrastructure
Post-Bid
$350,000 est. value
Moville, IA 51039

Woodbury County Law Enforcement Center Offsite Improvements
Infrastructure
Results
Sioux City, IA 51100

Andrew Avenue Paving and Utilities Improvement
Infrastructure
Results
$1,600,000 est. value
Sergeant Bluff, Sioux City, IA 51054

Water Facility SCADA Process Upgrades - 519-262 - City of Sioux City
Renovation, Alteration
Conception
$330,000 est. value
Sioux City, IA

Plywood Trail - 459-321 - City Of Sioux City
Infrastructure
Design
Sioux City, IA

Hamilton Boulevard (West 3rd Street and Tri View Avenue) Paving Improvements
Infrastructure
Bidding
$390,000 CJ est. value
Sioux City, IA 51104

Frontage Road Improvement Project
Infrastructure
Post-Bid
$3,000,000 est. value
Moville, IA 51039

PCC Pavement - Replace - K64
Infrastructure
Results
IA

Last Updated 08/09/2022 09:38 AM
Project Title

Perry Creek to Outer Drive Trail - 459-323 - City of Sioux City

Physical Address View project details and contacts
City, State (County) Sioux City, IA 51101   (Woodbury County)
Category(s) Heavy and Highway
Sub-Category(s) Maintenance, Paving/Reconstruction, Site Development
Contracting Method Competitive Bids
Project Status Abandoned, Construction start expected August 2022
Bids Due View project details and contacts
Estimated Value $125,000 [brand] Estimate
Plans Available from
Owner View project details and contacts
Architect View project details and contacts
Description

The Perry Creek to Outer Drive Trail Project includes the construction of an 8-foot wide trail along Hamilton Boulevard from Stone Park Boulevard to 36th Street/Country Club North (a distance of approximately 2,800 LF). The project will also include 5-foot wide bicycle lanes of each side of the road from 36th Street/Country Club Boulevard to Outer Drive North (a distance of approximately 4,400 LF). As of August 9, 2022, this project is no longer moving forward. *Project information has been obtained through a public capital improvement plan (CIP). A CIP is a financial schedule for short- and long-range projects which is updated regularly. Information listed in the CIP often evolves based on funding availability and the project details, including timeline and value, are subject to change. The content management team will continue to pursue additional details as they become available. As of June 16, 2022, no new information available

Details

Division 01 - General Requirements, Vehicular Access and Parking, Traffic Control, Temporary Barriers and Enclosures.
Division 32 - Exterior Improvements, Operation and Maintenance of Exterior Improvements, Flexible Paving, Asphalt Paving, Rigid Paving, Concrete Paving, Paving Specialties, Pavement Markings.
Division 33 - Utilities, Storm Drainage Utilities, Storm Drainage Structures.
Division 34 - Transportation, Operation and Maintenance of Transportation.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents