Similar Projects
Wastewater Treatment Facility Upgrade
New Construction, Infrastructure, Renovation
Bidding
$200,000 CJ est. value
Wonewoc, WI 53968

UV Disinfection System Replacement Project
New Construction, Renovation, Infrastructure
Bidding
$12,500,000 CJ est. value
Racine, WI 53403

Pressure Reducing Valve Repairs
Infrastructure
Sub-Bidding
$460,000 CJ est. value
Bayfield, WI 54814

District Wide Bottle Filler Stations - Bid Package 2
Alteration
Post-Bid
Milwaukee, WI 53228

Lead Service Line Program
Alteration
Post-Bid
Juneau, WI

Elevator Replacement, Roger Harring Stadium -MEP
Results
$675,000 est. value
La Crosse, WI 54601

Blackwell Job Corps Center Water Heater Replacement
Term Contract
Results
$25,000 to $100,000 est. value
Brodhead, Laona, WI 54541

Steam and Condensate Repairs
Renovation
Construction
$169,500 CJ est. value
Waupun, WI 53963

Steam and Condensate Repairs
Renovation
Construction
$169,500 CJ est. value
Waupun, WI 53963

2023 North Main Street
Infrastructure
Bidding
$500,000 CJ est. value
Westfield, WI 53964

Clarity Endcap Buildout
Renovation, Alteration
Post-Bid
Verona, WI 53593

Plumbing and Steamfitter Services at WVH-UG
Term Contract
Results

Exterior Envelope Repair - Lathrop Hall and Van Vleck Hall
Renovation
Construction
$5,290,000 CJ est. value
Madison, WI 53706

Keshena High School Lift Station Rehabilitation
Renovation, Infrastructure
Bidding
$700,000 CJ est. value
Keshena, WI 54135

Isolation Rooms
Demolition, Alteration
Post-Bid
Oneida, WI

Last Updated 01/16/2023 11:04 PM
Project Title

2023 Water System Improvements

Physical Address View project details and contacts
City, State (County) Jefferson, WI 53549   (Jefferson County)
Category(s) Single Trades
Sub-Category(s) Plumbing
Contracting Method Bids by Invitation, Competitive Bids
Project Status Results, Construction start expected March 2023
Bids Due View project details and contacts
Estimated Value $1,787,270 [brand] Estimate
Plans Available from Civil Engineer
Owner View project details and contacts
Architect View project details and contacts
Description

The proposed scope of work will include the following: Demolition of the existing wellhouse, ground reservoir and booster station, construction of a new municipal water supply wellhouse to include masonry building, well pump and associated mechanical piping, chemical feed equipment, HVAC, plumbing, electrical and instrumentation equipment, site work including paving and water main connections, and SCADA and controls work at the WWTP to integrate the water and wastewater SCADA systems. Additive bid work to integrate the remote water and sewer system components into the SCADA system via fiber optic communications. Bidders must be pre-qualified with the City of Jefferson within the last year or must be pre-qualified for this work 5 days prior to the bid deadline in accordance with Section 66.0903 of the Wisconsin Statutes. Each bidder must deposit, with his bid, security in the amount of 5% of the maximum bid amount. Bidders must be experienced in municipal pipeline and street construction. Additional Description: This project will be funded by the Safe Drinking Water Loan Program (SDWLP) established under Wisconsin State Statutes, as administered by the Wisconsin Department of Natural Resources. Neither the State of Wisconsin nor any of its departments, agencies, or employees is or will be party to this invitation for bids or any resulting contract. Disadvantaged Business Enterprises (DBE), including minority business enterprises (MBE) and women business enterprises (WBE) are encouraged to apply and be used to the greatest extent feasible. Qualified DBEs will be included in the Unified Certification Program WisDOT UCP list. Program policy requires all bidders to show good faith efforts to solicit proposals from DBEs. Contractors with a DBE classification are strongly encouraged to bid as the Prime Contractor on this project provided they are qualified to do the work. Award of the contract will be subject to the Federal government's policy of good faith effort for increased use of DBE businesses. A description of the policy and forms to be used are included in specifications. Funding under the SDWLP programs also requires all iron and steel products used in the construction of the project be produced in the United States (FFY 2014 Appropriations Act and/or Section 608 of the Federal Water Pollution Control Act (FWPCA)), including lined or unlined pipes and fittings, manhole covers and other municipal castings, hydrants, tanks, flanges, pipe clamps and restraints, valves, structural steel, reinforced precast concrete, and construction materials. The successful bidder will be required to conform to the wage requirements prescribed by the federal Davis-Bacon and Related Acts which requires that all laborers and mechanics employed by contractors and sub-contractors performing on contracts funded in whole or in part with federal funds in excess of $2,000 pay their laborers and mechanics not less than the prevailing wage rates and fringe benefits, as determined by the Secretary of Labor, for corresponding classes of laborers and mechanics employed on similar projects in the area, per the U.S. Department of Labor Wage and Hour Division May 29, 2009 Guidance. The City of Jefferson reserves the right to reject any and all bids, for whatever reason, and to waive any informalities in bids or in the bid process.

Details

Division 22 - Plumbing, Common Work Results for Plumbing.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents