Similar Projects
800 Broadway City Water Main Replacement
Bidding
$86,000 est. value
Cincinnati, OH 45202

Lynnhaven and Meyer Water Main Replacement
Bidding
$2,884,000 est. value
Dayton, OH

Clinton Street Waterline Replacement
Post-Bid
Bloomville, OH

Emergency Repair Water and Sewer Line Services
Post-Bid
Niles, OH 44446

Seneca, Ononta Water Main Replacement
Results
Cincinnati, OH

C Water Main Renewal
Results
Cleveland, OH

West Market Street Waterline Extension
Bidding
Less than $450,000 est. value
Troy, OH 45373

Fittings, Repair Parts, Service Equipment and Tools
Post-Bid
Painesville, OH 44077

Northridge MIU Installation and Water Meter Exchange
Results
Springfield, OH 45501

Village of Tuscarawas - Water
Renovation
Bidding
$1,794,000 est. value
Tuscarawas, OH

Well No. 24 and Raw Water Main
Post-Bid
Chillicothe, OH 45601

Waterline Construction
Results
$25,000 to $100,000 est. value
Lewis Center, OH 43035

Haven Water and Sewer Improvement Project
Bidding
Less than $285,000 est. value
Ravenna, OH 44266

2020 Large Valve Rehabilitation
Post-Bid
Dayton, OH 45402

Olive Street 8-Inch Waterline Replacement
Results
Less than $130,000 est. value
Findlay, OH 45840

Reported 12/17/2020 12:00 AM
Project Title

Water Line Repair

Physical Address View project details and contacts
City, State (County) Lakeside Marblehead, OH   (Ottawa County)
Category(s) Sewer and Water
Sub-Category(s) Water Lines
Contracting Method Competitive Bids.
Project Status Request for Quotations
Bids Due View project details and contacts
Estimated Value
Plans Available from Federal Agency
Owner View project details and contacts
Architect View project details and contacts
Description

The Contractor is required to excavate for new water line from the front of the building, to wrap around to the rear at the water. The Contractor is required to install 2 frost free hydrants. This will include digging approx. over 1000 feet and will require at least 1.5 inch water line. The water line will be 36 inches deep unless bedrock is hit. If bedrock is hit, then the water line will rest upon the bed rock. The Contractor is required to install 3 shut off valves, one main valve and one for each hydrant. The Contractor is required to back fill all debris upon completion of work. Contractor must provide 5-Year Warranty on all Installs

Details

Division 33 - Utilities, Instrumentation and Control for Utilities, Water Utilities, Water Utility Distribution Piping, Water Utility Distribution Equipment, Disinfecting of Water Utility Distribution, Water Utility Storage Tanks.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents