Similar Projects
Access Control Point Program Design Build II -- RFI(2)
Design

Indefinite Delivery / Indefinite Quantity (IDIQ) Global Contingency Construction (GCC) Multiple Award Contract (MAC)
Design
Less than $5,000,000,000 est. value

Elevator Renovations, Office on Aging
Renovation - 5,500 SF
Bidding
Bel Air, MD 21014

Defense Health Agency - Medical Facility Operations and Maintenance
Bidding
$2,500 to $90,000,000 est. value

Design Build Multiple Award Task Order Contract
New Construction
Post-Bid
$500,000 to $10,000,000 est. value

Space Renovation- Office of The Public Defender
Renovation, Demolition - 3,500 SF
Post-Bid
Bel Air, MD 21014

Army Mechanical MATOC
Results
Less than $2,000,000 est. value

Air Force Contract Augmentation Program (AFCAP) V
Results

SB Fuels Multiple Award Task Order Contract (MATOC)
Design
Less than $349,000,000 est. value
Washington, DC

Sources Sought Synopsis for United States Coast Guard (USCG) Disaster Reconstitution Multiple Award Construction Contract
Post-Bid
$3,000,000 to $15,000,000,000 est. value

Job Order Contracts (Joc) Region C
New Construction, Renovation
Results
$10,000,000 est. value

Rapid Disaster Infrastructure (RDI) #2
Design
Less than $99,000,000 est. value

Remediation of Raccoon Latrine
- 1,248 SF
Post-Bid
Less than $50,000 est. value
Pylesville, MD 21050

Y--FY19 Job Order Contract (JOC) NAVFAC Washington
Results
$10,000 to $30,000,000 est. value
Washington, DC 20374

D/B Northeast MATOC
Post-Bid
$1,000,000 to $250,000,000 est. value

Reported 11/29/2019 08:22 AM
Project Title

APG Building 5103 Renovations

Physical Address View project details and contacts
City, State (County) Aberdeen Proving Ground, MD 21005   (Harford County)
Category(s) Government/Public
Sub-Category(s) Misc. Buildings
Contracting Method Competitive Bids.
Project Status Sub-Bidding
Bids Due View project details and contacts
Estimated Value $5,000,000 to $10,000,000
Plans Available from Federal Agency
Owner View project details and contacts
Architect View project details and contacts
Description

SCOPE: The repairs for Building E5103 is a comprehensive project that will restore the facility quality to Q1/F1 as well as provide labor, equipment and materials to repair the building to current communication center standards. The project scope will include engineering and design services for the repairs. Building components and systems to be repaired include exterior structural and architectural components; interior walls, floors, ceilings, fixtures and finishes; ADA-compliant accessibility features to include a ramp, elevator, and restrooms; failed or failing heating, ventilation, and air conditioning (HVAC) systems; domestic, sanitary, and heating system plumbing; electrical power supply, capacity, distribution, grounding, and emergency backup; interior, exterior, and emergency lighting; telecommunications cabling and wiring; and fire safety systems, including sprinklers, suppression systems, and egress signage. As a communication center building, Building E5103 will require secure and non-secure repairs and upgrades. Also included is the abatement of HAZMAT materials (asbestos) that are prevalent throughout the structure.

Details

Division 03 - Concrete, Concrete Forming and Accessories, Cast-in-Place Concrete.
Division 04 - Masonry, Unit Masonry.
Division 06 - Wood, Plastics, and Composites, Rough Carpentry, Finish Carpentry, Millwork.
Division 07 - Thermal and Moisture Protection, Dampproofing and Waterproofing, Thermal Protection, Weather Barriers.
Division 08 - Openings, Doors and Frames, Entrances, Windows.
Division 09 - Finishes, Plaster and Gypsum Board, Acoustical Ceilings, Flooring, Carpeting, Acoustic Treatment, Painting.
Division 12 - Furnishings.
Division 21 - Fire Suppression, Water-Based Fire-Suppression Systems, Fire-Extinguishing Systems.
Division 22 - Plumbing, Instrumentation and Control for Plumbing, Plumbing Piping, Plumbing Equipment, Plumbing Fixtures, Drinking Fountains and Water Coolers.
Division 23 - Heating, Ventilating, and Air Conditioning (HVAC), Instrumentation and Control for HVAC, HVAC Air Distribution, Central HVAC Equipment.
Division 26 - Electrical, Power Distribution Units, Lighting, Interior Lighting, Emergency Lighting, Exit Signs, Exterior Lighting.
Division 27 - Communications, Structured Cabling, Data Communications, Voice Communications.
Division 28 - Electronic Safety and Security.
Division 31 - Earthwork, Clearing and Grubbing, Grading, Soil Treatment.
Division 32 - Exterior Improvements, Flexible Paving, Asphalt Paving, Rigid Paving, Concrete Paving, Curbs, Gutters, Sidewalks, and Driveways, Paving Specialties, Parking Bumpers, Pavement Markings, Fences and Gates, Irrigation, Planting.
Division 33 - Utilities.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents