Similar Projects
500 North - 700 East to 900 East - City of Provo
Infrastructure
Conception
Provo, UT 84601

500 West - 1560 South to 920 South
Alteration
Conception
$1,800,000 est. value
Provo, UT 84601

2022 Santaquin Center Street Storm Drain Improvements Project
Infrastructure
Design
$883,409 CJ est. value
Santaquin, UT 84655

2022 Santaquin Center Street Storm Drain Improvements Project
Infrastructure
Design
$883,409 CJ est. value
Santaquin, UT 84655

EMC Mid Valley Road Extension
Infrastructure
Bidding
$600,000 CJ est. value
Eagle Mountain, UT 84005

RFP D/B - USCG National Multiple Award Construction Contract (NMACC III)
Term Contract
Post-Bid
$25,000,000 CJ est. value
Seattle, WA 98174

RFP Construction Manager - Eagle Mountain Boulevard Widening (CMGC)
Infrastructure
Post-Bid
$9,034,845 CJ est. value
Eagle Mountain, UT 84043

Payson City 100 South Pressurized Irrigation Waterline Project
Infrastructure
Results
Payson, UT 84651

Foothill Boulevard Extension - Lariat to Pony Express Parkway
Infrastructure
Results
$17,036,199 CJ est. value
Saratoga Springs, UT 84045

Active Auto / Spanish Fork
New Construction, Infrastructure - 12,350 SF
Construction
$3,300,000 CJ est. value
Spanish Fork, UT 84660

American Fork City Fire Station 52
New Construction, Infrastructure
Construction
$4,500,000 CJ est. value
American Fork, UT 84003

East Center Street Townhomes
New Construction, Infrastructure
Pending Verification
$1,500,000 CJ est. value
Spanish Fork, UT 84660

El Tenedor Logistics Center
New Construction, Infrastructure - 800,757 SF
Pending Verification
$87,000,000 CJ est. value
Spanish Fork, UT 84660

24" Transmission Line 1730 North - 1500 West to 1680 North Geneva - City of Provo
Infrastructure
Conception
$8,000,000 est. value
Provo, UT 84603

Harvey Well Deepening Project
Infrastructure
Design
$170,000 CJ est. value
Cedar Hills, UT 84062

Last Updated 10/06/2023 05:34 AM
Project Title

Rock Canyon Aquifer Storage Transmission Line

Physical Address View project details and contacts
City, State (County) Provo, UT 84604   (Utah County)
Category(s) Heavy and Highway, Sewer and Water
Sub-Category(s) Site Development, Water Lines
Contracting Method Competitive Bids
Project Status Results, Construction start expected October 2023
Bids Due View project details and contacts
Estimated Value $37,974,079 [brand] Estimate
Plans Available from Agency's Affiliate
Owner View project details and contacts
Architect View project details and contacts
Description

Construction services including sewer maintenance and repair, roads and highways and excavation and backfill services, levee and dam construction and digging, ditching, road grading, rock stabilization, equipment rental or lease, and energy conservation. Concrete, cement, plaster, lime, mortars, metal Industrial pumps and compressors and parts and accessories Pipe piping and pipe fittings including adapters and angle face rings and backup flanges and baffles and bends and bushings and caps and connectors Electrical system services including wiring and other electrical maintenance including HVAC construction and maintenance and installation and mechanical and machine installation and repair services The Work generally includes, but is not limited to, the following: 1. Pump station construction including, all mechanical, electrical, plumbing, structural, civil, and architectural. 2. Pipe connections to existing water mains located at the pump station. 3. Water main construction from the pump station to Rock Canyon. 4. One pipe outlet in Rock Canyon. 5. Three underground vaults. 6. Commissioning of the system. 7. Decommissioning and demolition of an existing pump station. Provo City reserves the right to reject any or all Bids or to waive any informality or technicality in any Bid if deemed to be in the best interest of Provo City. Question Submission Close Date 9/6/2023 12:00 PM MDT Bid-Results SCHEDULE 1A - BOOSTER STATION - BABA ACT COMPLIANCE REQUIRED COP Construction, LLC $ 14,415,473 SCHEDULE 1B - BOOSTER STATION - BABA ACT COMPLIANCE NOT REQUIRED Whitaker Construction Co., Inc $ 13,423,900 SCHEDULE 2A - TRANSMISSSION LINE - BABA ACT COMPLIANCE REQUIRED Condie Construction Co $ 5,274,658 SCHEDULE 2B - TRANSMISSSION LINE - BABA ACT COMPLIANCE NOT REQUIRED Condie Construction Co $ 4,860,048

Details

Division 33 - Utilities, Instrumentation and Control for Utilities, Water Utilities, Water Utility Distribution Piping, Water Utility Distribution Equipment, Disinfecting of Water Utility Distribution, Water Utility Storage Tanks.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents