Similar Projects
Laurel Ridge Elementary School Major Building System Replacement
Renovation
Conception
Decatur, GA 30033

Woodridge Elementary School Major Building System Replacement
Renovation
Conception
Stone Mountain, GA 30083

KIPP Soul School
Renovation - 24,100 SF
Design
Less than $1,000,000 est. value
Atlanta, GA 30331

Needwood Middle, Golden Isles Elementary and Oglethorpe Point Elementary Modifications and Renovations
Renovation
Post-Bid
Brunswick, Saint Simons Island, GA 31525

New Seminole County PreK-12 Campus
New Construction
Post-Bid
$38,000,000 est. value
Donalsonville, GA

Matilda Harris Elementary School
Renovation
Results
Kingsland, GA

Crooked River Elementary School - Phase 1
Results
Saint Marys, GA 31558

Philadelphia Romanian Church
Addition - 14,285 SF
Construction
Lawrenceville, GA 30045

Davidson Fine Arts School Renovations and Additions Phase II
Renovation, Addition
Construction
$3,000,000 to $5,000,000 est. value
Augusta, GA 30901

Crossroads of Life Baptist Church
New Construction - 15,000 SF
Pending Verification
$1,000,000 to $5,000,000 CJ est. value
Canton, GA 30114

Chesnut Elementary School Major Building System Replacement
Renovation
Conception
Atlanta, GA 30338

Red Devil Stadium and Athletic Complex
Renovation
Post-Bid
Less than $16,000,000 est. value
Jackson, GA 30233

Lula Elementary Renovations and Roof
Renovation
Results
Lula, GA 30554

Athens Academy Daughtry Building Renovation
New Construction, Renovation, Demolition
Construction
Athens, GA 30606

Gracepoint School
Renovation - 30,000 SF
Conception
Marietta, GA 30060

Last Updated 08/30/2022 10:31 AM
Project Title

Sugarmill Elementary School Renovation - State DOE

Physical Address View project details and contacts
City, State (County) Saint Marys, GA 31558   (Camden County)
Category(s) Education
Sub-Category(s) Elementary School
Contracting Method Competitive Bids
Project Status Construction start expected May 2023
Bids Due View project details and contacts
Estimated Value $10,000,000 [brand] Estimate
Plans Available from County Agency
Owner View project details and contacts
Architect View project details and contacts
Description

Renovations to Existing Sugarmill Elementary School State DOE - This project will coincide with "Sugarmill Elementary School Renovations - ESSER" - These projects will bid separately with 2 separate sets of documents but all work will occur at the same time on the same school campus. - Please contact our office for further clarification, if needed. - Additions to this school will also bid on the same day under "Sugarmill Elementary School Addition - ESSER - All Trades " Estimated Start Date: 5/25/2023 Estimated End Date: 7/19/2023

Details

Division 03 - Concrete, Concrete Forming and Accessories, Cast-in-Place Concrete, Precast Concrete.
Division 04 - Masonry, Unit Masonry.
Division 05 - Metals.
Division 06 - Wood, Plastics, and Composites, Rough Carpentry, Finish Carpentry.
Division 07 - Thermal and Moisture Protection, Dampproofing and Waterproofing, Thermal Protection.
Division 08 - Openings, Doors and Frames, Specialty Doors and Frames, Entrances, Storefronts, and Curtain Walls, Windows, Hardware.
Division 09 - Finishes, Plaster and Gypsum Board, Tiling, Ceilings, Resilient Flooring, Carpeting, Painting.
Division 10 - Specialties, Visual Display Units, Chalkboards, Markerboards, Tackboards, Signage, Compartments and Cubicles, Toilet, Bath, and Laundry Accessories, Toilet Accessories, Emergency Aid Specialties, Fire Protection Specialties, Lockers, Flagpoles.
Division 11 - Equipment, Foodservice Equipment, Foodservice Storage Equipment, Food Preparation Equipment, Food Delivery Carts and Conveyors, Food Cooking Equipment, Food Dispensing Equipment, Ice Machines, Educational and Scientific Equipment, Audio-Visual Equipment, Play Field Equipment and Structures.
Division 12 - Furnishings, Casework, Countertops, Office Furniture, Institutional Furniture, Classroom Furniture.
Division 21 - Fire Suppression.
Division 22 - Plumbing, Common Work Results for Plumbing, Plumbing Piping, Plumbing Equipment, Plumbing Fixtures, Drinking Fountains and Water Coolers.
Division 23 - Heating, Ventilating, and Air Conditioning (HVAC), Common Work Results for HVAC, Instrumentation and Control for HVAC, HVAC Air Distribution, Ventilation Hoods, Commercial-Kitchen Hoods.
Division 25 - Integrated Automation.
Division 26 - Electrical, Instrumentation and Control for Electrical Systems, Lighting, Interior Lighting, Emergency Lighting, Exit Signs, Exterior Lighting.
Division 27 - Communications, Common Work Results for Communications, Structured Cabling, Voice Communications, Audio-Video Communications, Audio-Video Systems, Integrated Audio-Video Systems and Equipment, Integrated Audio-Video Systems and Equipment for Classrooms, Distributed Communications and Monitoring Systems.
Division 28 - Electronic Safety and Security, Common Work Results for Electronic Safety and Security, Electronic Access Control and Intrusion Detection, Fire Detection and Alarm.
Division 31 - Earthwork, Common Work Results for Earthwork, Grading, Earthwork Methods, Soil Treatment.
Division 32 - Exterior Improvements, Flexible Paving, Rigid Paving, Fences and Gates, Irrigation, Planting, Turf and Grasses.
Division 33 - Utilities, Water Utilities, Sanitary Sewerage Utilities, Storm Drainage Utilities, Electrical Utilities, Communications Utilities.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents