Similar Projects
PS1 24" Forcemain - Construction - 22A01 - North Shore Water Reclamation District
Infrastructure
Conception
Less than $5,368,000 est. value
Gurnee, IL

Clarifier Collection Systems - 18R01 - North Shore Water Reclamation District
Demolition, Alteration
Conception
$3,799,400 est. value
Gurnee, IL

Entry Plaza
Infrastructure
Bidding
$460,000 est. value
Addison, IL 60101

Meter/Meter Reading System Replacement
Infrastructure
Bidding
$70,000 est. value
Machesney Park, IL

Vernon Hills West Pump Station Force Main Analysis for Lake County
Post-Bid
Waukegan, IL

Purchase of Potable Water Meters
Post-Bid
Schaumburg, IL

2019 Bond Projects - Phase 2
Renovation
Results
Less than $8,311,066 est. value
Quincy, IL

Lead Service Line Replacement
Results
Less than $4,000,000 est. value
Springfield, IL

Dundee Road: Greenview Road to Huehl Road - Water Main Replacement (Construction) - Village of Northbrook
Infrastructure
Conception
$4,276,300 est. value
Northbrook, IL 60062

2022 Rockton Aspland Watermain, Dewey Sanitary, and V and H Replacement
Renovation, Infrastructure
Bidding
$211,000 est. value
Rockton, IL

Fire Hydrant Maintenance and Flow Testing
Post-Bid
Downers Grove, IL

Lakewood Place Water Main Replacement
Results
Less than $211,845 est. value
Aurora, IL 60506

2020 Water Main Improvements
Infrastructure
Bidding
$2,000,000 est. value
Heyworth, IL

Revise Domestic Water System - Division 02
Post-Bid
Chicago, IL 60612

South Madison Street Water Main Replacement
Results
Oswego, IL 60543

Reported 07/08/2022 12:00 AM
Project Title

54th Street Water Main

Physical Address View project details and contacts
City, State (County) Quincy, IL 62305   (Adams County)
Category(s) Sewer and Water
Sub-Category(s) Water Lines
Contracting Method Competitive Bids.
Project Status Bidding, Construction Start Expected August 2022
Bids Due View project details and contacts
Estimated Value $376,000 [brand] Estimate
Plans Available from Civil Engineer
Owner View project details and contacts
Architect View project details and contacts
Description

The proposed work is officially known as the 54th Street Water Main is further described as furnishing and installing approximately 2535 linear feet of 10-inch SDR-21 PVC watermain, 115 feet of Auger bore and jack, 10-inch Yelowmine SDR-21 with 18-inch diameter steel casing, 310 linear feet of Horizontal direction drill 10-inch diameter Yelomine watermain with associated valves, fittings, pipes, and surface restoration.

Details

Division 33 - Utilities, Instrumentation and Control for Utilities, Water Utilities, Water Utility Distribution Piping, Water Utility Distribution Equipment, Disinfecting of Water Utility Distribution, Water Utility Storage Tanks.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents