Similar Projects
Wiley Boulevard Trail From 16th Avenue SouthWest To Williams Boulevard (Highway 151) - 325052 - City Of Cedar Rapids
Infrastructure
Conception
$300,000 CJ est. value
Cedar Rapids, IA 52404

TIF Blairs Ferry Road Improvements And 18th Avenue Extension - 301881 - City Of Cedar Rapids
Infrastructure
Conception
$333,000 CJ est. value
Cedar Rapids, IA 52401

Central Campus Multipurpose
Renovation, Infrastructure
Design
$921,000 CJ est. value
Des Moines, IA 50309

43rd Street Reconstruction
Infrastructure
Design
$605,625 CJ est. value
Davenport, IA 52806

Southfork Drive Culvert Repairs
Infrastructure
Bidding
$163,316 CJ est. value
Waukee, IA 50263

HMA Resurfacing / Heater Scarification
Infrastructure
Bidding
$3,500,000 CJ est. value
Sioux City, IA 51104

Readiness Center and SE Fire Station and Training Facility
LEED Certification, New Construction, Infrastructure - 114,004 SF
Post-Bid
$5,250,000 CJ est. value
West Des Moines, IA 50265

LTC Building Demolition and Grading
Demolition, Infrastructure
Post-Bid
Grundy Center, IA

27th Street Corridor Site Work
Infrastructure
Results
$753,800 est. value
Cedar Falls, IA 50614

Woodbury County Law Enforcement Center Offsite Improvements
Infrastructure
Results
Sioux City, IA 51100

The Lab
New Construction, Infrastructure
Construction
$21,260,000 CJ est. value
Des Moines, IA 50309

SUX Aviation Center Project Rebid
New Construction, Infrastructure - 39,400 SF
Pending Verification
$13,644,584 CJ est. value
Sioux City, IA 51111

Kum & Go Grand Avenue and Raccoon River Drive / West Des Moines
New Construction, Infrastructure
Pending Verification
$1,500,000 CJ est. value
West Des Moines, IA 50266

Public Safety Building - PUBSF 24-01 - City of Waukee
New Construction, Infrastructure
Conception
$30,000,000 CJ est. value
Waukee, IA 50263

Northglen Stream Improvements - City of Johnston
Infrastructure
Design
$400,000 CJ est. value
Johnston, IA 50131

Last Updated 11/04/2022 01:38 PM
Project Title

Mason Road Detention Expansion - SEW-22-006 - City of Burlington

Physical Address View project details and contacts
City, State (County) Burlington, IA 52601   (Des Moines County)
Category(s) Heavy and Highway, Sewer and Water
Sub-Category(s) Sewage Treatment Plant, Site Development
Contracting Method Competitive Bids
Project Status Conceptual Design, Construction start expected June 2023
Bids Due View project details and contacts
Estimated Value $200,000 [brand] Estimate
Plans Available from
Owner View project details and contacts
Architect View project details and contacts
Description

Calls for the expansion of the Mason Road Detention The project is included in the city's 2023-2027 Capital Improvement Program (CIP). As of November 4, 2022, design has not begun yet but will be handled in house by the owner. No firm timeline has been established for the construction.* *Project information has been obtained through a public capital improvement plan (CIP). A CIP is a financial schedule for short- and long-range projects which is updated regularly. Information listed in the CIP often evolves based on funding availability and the project details, including timeline and value, are subject to change. The content management team will continue to pursue additional details as they become available.

Details

Division 02 - Existing Conditions, Subsurface Investigation.
Division 03 - Concrete, Precast Concrete.
Division 04 - Masonry, Unit Masonry.
Division 05 - Metals, Structural Metal Framing, Metal Fabrications.
Division 06 - Wood, Plastics, and Composites, Rough Carpentry.
Division 07 - Thermal and Moisture Protection, Dampproofing and Waterproofing, Thermal Protection.
Division 08 - Openings, Doors and Frames, Windows, Hardware.
Division 09 - Finishes, Painting and Coating.
Division 10 - Specialties, Signage, Compartments and Cubicles, Emergency Aid Specialties, Fire Protection Specialties, Storage Assemblies.
Division 11 - Equipment, Laboratory Equipment.
Division 14 - Conveying Equipment.
Division 21 - Fire Suppression, Fire-Extinguishing Systems.
Division 22 - Plumbing, Instrumentation and Control for Plumbing, Plumbing Piping, Plumbing Equipment, Plumbing Fixtures.
Division 23 - Heating, Ventilating, and Air Conditioning (HVAC), Instrumentation and Control for HVAC, HVAC Air Distribution.
Division 26 - Electrical, Instrumentation and Control for Electrical Systems, Interior Lighting, Emergency Lighting, Exit Signs, Exterior Lighting.
Division 27 - Communications, Structured Cabling, Data Communications, Voice Communications, Distributed Audio-Video Communications Systems.
Division 28 - Electronic Safety and Security, Electronic Access Control and Intrusion Detection, Access Control, Intrusion Detection, Electronic Surveillance, Electronic Detection and Alarm.
Division 31 - Earthwork, Earthwork Methods.
Division 32 - Exterior Improvements, Flexible Paving, Rigid Paving, Curbs, Gutters, Sidewalks, and Driveways, Fences and Gates, Turf and Grasses.
Division 33 - Utilities, Water Utilities, Storm Drainage Utilities, Electrical Utilities, Communications Utilities.
Division 44 - Pollution and Waste Control Equipment, Common Work Results for Pollution and Waste Control Equipment, Air Pollution Control, Noise Pollution Control, Odor Control, Water Pollution Control Equipment, Solid Waste Control and Reuse, Waste Thermal Processing Equipment, Fluidized Bed Combustion Equipment, Rotary Kiln Incinerators, Pyrolysis Equipment, Hazardous Waste and Medical Waste Incinerators, Heat Recovery Equipment for Waste Thermal Processing, Synthesis Gas Cleanup and Handling Equipment.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents