Similar Projects
Mayor's Point Terminal - Fender Replacement project
Infrastructure
Bidding
Brunswick, GA 31520

Blythe Island Regional Park Fishing Pier Repair and Boat Launch Pier Rehabilitation - FY22
Infrastructure
Post-Bid
Brunswick, GA 31523

Tilden Norris Marshwalk Repairs
Infrastructure
Post-Bid
Saint Marys, GA 31558

GA ERFO NPS CUIS 2017-1(1)
Results
$1,000,000 to $5,000,000 est. value
Saint Marys, GA

South River Trail Boardwalk Repair
Results
Decatur, GA 30030

Floating Dock and Gangway Repair/Replacement - Brushy Branch Park
Results
Rome, GA 30165

Dock Refurbishments at the East River Terminal
Results
Brunswick, GA 31520

Wells Creek Bridge and ST. Simons Island Fishing Pier Rehabilitation 2021
Results
Saint Simons, GA

Dry Docking and Repair of the Research Vessel Savannah 2021
Results
Athens, GA

Riverside Parkway At Sweetwater Creek Bridge Rehabilitation
Results
Douglasville, GA

Purchase and Installation of Aluminum Piers
Results
Lawrenceville, GA 30045

Providence Park Improvements
New Construction - 635 SF
Results
$206,731 est. value
Milton, GA 30009

Floating Dock and Gangway Replacement for Lower Lock and Dam Park
Infrastructure
Results
Rome, GA 30161

Berth 1 Fender Replacement
Infrastructure
Results
$750,000 to $1,500,000 est. value
Brunswick, GA 31523

Design-Build Etowah River Park Canoe Launch
Infrastructure
Results
Dawsonville, GA 30534

Last Updated 02/02/2022 11:02 AM
Project Title

Shamrock CUB Deck Replacement

Physical Address View project details and contacts
City, State (County) Jonesboro, GA 30236   (Clayton County)
Category(s) Heavy and Highway
Sub-Category(s) Dock/Pier/Marine
Contracting Method Competitive Bids.
Project Status Results
Bids Due View project details and contacts
Estimated Value
Plans Available from
Owner View project details and contacts
Architect View project details and contacts
Description

Scope: The project includes to replace the wood deck at our Shamrock Community Use Building, located at 2610 Shamrock Road, Jonesboro, Georgia 30236. An estimated square footage for the area is 5,670 sq.ft. The contractor must confirm square footage during the mandatory site visit. The Contractor shall replace existing decking boards with 5/4 Trex material, and any warped/rotten floor joist, and/or add joist as needed to level up floor. The Contractor shall replace all spindles with black cast iron material with Trex material cap. The railing spindles need to be black cast iron with a wavy design. The spindles will need to be singular pieces which screw into the railing. This will allow CCWA to replace a single spindle and not an entire section, if damaged. The wood post will remain wood, however, the handrails will be changed out to match the material used for decking boards.

Details

Division 35 - Waterway and Marine Construction, Common Work Results for Waterway and Marine Construction, Waterway and Marine Construction and Equipment, Marine Construction and Equipment.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents