Similar Projects
AI Influent Pump Station Improvements
New Construction
Design
Less than $2,900,000 est. value
Saint Augustine, FL 32080

Lift Station No. 42 Replacement
Renovation
Bidding
Saint Petersburg, FL 33716

118th Street and Wilson Boulevard Pump Stations
New Construction
Bidding
$11,000,000 est. value
Jacksonville, FL 32210

Kaye Street Re-Pump Station Building Expansion
Addition
Post-Bid
West Palm Beach, FL

SRF Wastewater Improvements Phase IIA
Post-Bid
De Funiak Springs, FL 32433

Repair Lift Station Pumps Bldgs. 650 and 1497 & Replace Lift Station Bldg. 943, Patrick AFB, FL
Results
$1,000,000 to $5,000,000 est. value
Patrick AFB, FL 32925

DLTWTF Master Plan Improvements Design Build
Results
$19,000,000 est. value
Tampa, FL

Mid-County Master Lift Station Replacement
Construction
Dunedin, FL 34698

Packing District Park - Master Lift Station Upgrades
Renovation
Construction
Orlando, FL 32869

Lift Station CA-14 Rehabilitation Improvements Project
Renovation
Bidding
Callaway, FL

Progressive Design Build Services Lift Station 87
Post-Bid
Saint Petersburg, FL 33731

Pump Station Package 23 Improvements
Results
Less than $2,116,000 est. value
Orlando, FL 32801

Cooper Creek Lift Station Relocation
Renovation
Construction
$1,200,000 est. value
University Park, FL 34201

Mid County Lift Station Pump and Panel Improvements
Renovation
Bidding
$460,000 est. value
Port Charlotte, Punta Gorda, FL 33952

Lift Station No. 6 Relocation and Collection System Improvements
Renovation
Post-Bid
Mulberry, FL 33860

Last Updated 11/05/2021 09:04 AM
Project Title

Tradewinds WRF Decommissioning and Force Main

Physical Address View project details and contacts
City, State (County) FL   (Marion County)
Category(s) Sewer and Water
Sub-Category(s) Lift and Pump Stations
Contracting Method Competitive Bids.
Project Status Results
Bids Due View project details and contacts
Estimated Value $1,600,000
Plans Available from
Owner View project details and contacts
Architect View project details and contacts
Description

Contractor to construct a new lift station, approximately 15,000 LF of forcemain and decommission an existing WW package plant. To mitigate long lead times, two (2) Gundfos Submersible Sewage Pumps and one (1) Duplex Control Panel have been pre-ordered

Details

Lift and Pump Stations, New Construction.
Division 03 - Concrete.
Division 04 - Masonry.
Division 05 - Metals.
Division 06 - Wood, Plastics, and Composites.
Division 07 - Thermal and Moisture Protection.
Division 08 - Openings.
Division 09 - Finishes.
Division 10 - Specialties, Signage, Toilet, Bath, and Laundry Accessories, Fire Protection Specialties, Fire Extinguishers, Storage Specialties.
Division 11 - Equipment.
Division 12 - Furnishings.
Division 14 - Conveying Equipment, Scaffolding.
Division 21 - Fire Suppression.
Division 22 - Plumbing.
Division 23 - Heating, Ventilating, and Air Conditioning (HVAC).
Division 26 - Electrical.
Division 27 - Communications, Data Communications, Voice Communications, Audio-Video Systems.
Division 28 - Electronic Safety and Security.
Division 31 - Earthwork.
Division 32 - Exterior Improvements, Fences and Gates, Turf and Grasses.
Division 33 - Utilities, Common Work Results for Utilities, Water Utility Distribution Equipment, Water Utility Pumping Stations, Wastewater Utility Pumping Stations, Sanitary Utility Sewerage Force Mains.
Division 40 - Process Integration, Water Process Piping.
Division 45 - Industry-Specific Manufacturing Equipment.
Division 46 - Water and Wastewater Equipment.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents