Similar Projects
Grade School Renovations
Renovation, Addition - 7,000 SF
Design
$3,500,000 est. value
Orion, IL 61273

Phase IV Group 2 STR
Post-Bid
Chicago, IL 60651

Flooring Replacement
Post-Bid
Deerfield, IL

Elementary School South - Bid Release 1
Renovation, Addition - 18,000 SF
Results
Vernon Hills, IL 60061

NCP Hibbard Elementary School
Results
Chicago, IL 60625

Holy Family Parish Building
Addition - 14,005 SF
Construction
Shorewood, IL 60404

Worth Elementary
Renovation, Addition
Construction
Worth, IL 60482

Common Area Carpet
Post-Bid
Alsip, IL

2021 Flooring Replacement
Results
Crystal Lake, IL

Kanoon 2021-29071-ROF / Polaris 2021-67081-ROF
Post-Bid
Less than $8,700,000 est. value
Chicago, IL 60623

Meehan Elementary School
Renovation, Addition
Results
Belvidere, IL 61008

Mckenzie Elementary School and Romona Elementary School
Renovation, Addition
Post-Bid
Wilmette, IL

2021 Facility Improvements
Renovation
Results
Less than $400,000 est. value
Moline, IL 61265

ROF Dett ES & Ericson ES
Post-Bid
$8,000,000 est. value
Chicago, IL 60612

PPS Hines Primary School Secure Entry
Renovation
Results
Peoria, IL 61614

Reported 05/21/2022 12:00 AM
Project Title

Desoto Elementary School Classroom and Cafeteria Flooring Replacement Work

Physical Address View project details and contacts
City, State (County) De Soto, IL 62924   (Jackson County)
Category(s) Education, Single Trades
Sub-Category(s) Elementary School, Flooring
Contracting Method Competitive Bids.
Project Status Bidding, Construction Start Expected June 2022
Bids Due View project details and contacts
Estimated Value $200,000 [brand] Estimate
Plans Available from Architect
Owner View project details and contacts
Architect View project details and contacts
Description

1. Work to be covered by the bid shall include removal of existing asbestos containing floor tile and mastic as well as purchase and installation of new flooring systems, wall base, transitions strips, etc., and all associated work as described in the Construction Documents. B. Type of Contract: 1. Asbestos Contractor 2. General Contractor

Details

Elementary School, Renovation.
Division 02 - Existing Conditions, Demolition, Selective Demolition, Selective Interior Demolition.
Division 06 - Wood, Plastics, and Composites, Rough Carpentry, Finish Carpentry.
Division 07 - Thermal and Moisture Protection, Dampproofing and Waterproofing, Thermal Protection.
Division 08 - Openings, Doors and Frames, Windows.
Division 09 - Finishes, Plaster and Gypsum Board, Ceilings, Flooring, Painting and Coating.
Division 21 - Fire Suppression.
Division 22 - Plumbing.
Division 23 - Heating, Ventilating, and Air Conditioning (HVAC), Instrumentation and Control for HVAC, HVAC Air Distribution.
Division 26 - Electrical, Lighting.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents