Similar Projects
Blueberry Road
Infrastructure
Design
$410,000 CJ est. value
Milladore, WI 54454

Blueberry Road
Infrastructure
Design
$410,000 CJ est. value
Milladore, WI 54454

Wisconsin Rapids SISP Signal Improvement Design
Infrastructure
Bidding
$395,000 CJ est. value
Wisconsin Rapids, WI 54495

Wisconsin Rapids SISP Signal Improvement Design
Infrastructure
Bidding
$395,000 CJ est. value
Wisconsin Rapids, WI 54495

Asphalt Pavement Projects - 2021
Renovation
Post-Bid
Marshfield, WI

2021 Curb And Gutter And Sidewalk Maintenance Proposal Request
Renovation
Post-Bid
Wisconsin Rapids, WI

Airfield Paving Construction MATOC
Results
Less than $400,000,000 est. value

Local Road Improvement Program (LRIP)
Results
Hewitt, WI 54441

Polymer Overlay
Infrastructure
Bidding
$350,000 CJ est. value
Wisconsin Rapids, WI 54494

Highway and Structure
Infrastructure
Post-Bid
Marshfield, WI

6th Street Road Extension
Results
Port Edwards, WI

2021 Road Work
Infrastructure
Post-Bid
Marshfield, WI

Yellowstone Drive Reconstruction
Results
Hewitt, WI 54441

Babcock - Nekoosa, CTH G (N) - STH 73
Infrastructure
Post-Bid
$1,000,000 to $1,999,999 est. value
Babcock, Nekoosa, WI

Statewide Pavement Maintenance 2021-2022
Term Contract
Results
Less than $5,000 est. value

Last Updated 08/02/2022 06:32 PM
Project Title

2022 Chip Seal Church and Young Road Bid

Physical Address View project details and contacts
City, State (County) Saratoga, WI 54494   (Wood County)
Category(s) Heavy and Highway
Sub-Category(s) Maintenance, Paving/Reconstruction, Site Development
Contracting Method Competitive Bids
Project Status Construction start expected August 2022
Bids Due View project details and contacts
Estimated Value $62,311 [brand] Estimate
Plans Available from Agency's Affiliate
Owner View project details and contacts
Architect View project details and contacts
Description

1. Crack-filling over band, Chip seal and traffic control for Church Avenue from 36th Street to 52nd Street; approximately 1 mile and 2. Chip seal and traffic control for Young Street South from Highway 73 to end of existing asphalt; approximately 1 mile are being accepted. Both roads are 22 foot wide. Spray rate .38 gallons per square yard, using CRS2-P emulsified asphalt and 3/8 chip. Completion of the project must be before September 30th, 2022. The Town of Saratoga reserves the right to reject any or all bids and to waive any informality in bidding and accept any bid most advantageous to the Town of Saratoga.

Details

Division 01 - General Requirements, Vehicular Access and Parking, Traffic Control, Temporary Barriers and Enclosures.
Division 32 - Exterior Improvements, Operation and Maintenance of Exterior Improvements, Flexible Paving, Asphalt Paving, Rigid Paving, Concrete Paving, Paving Specialties, Pavement Markings.
Division 33 - Utilities, Storm Drainage Utilities, Storm Drainage Structures.
Division 34 - Transportation, Operation and Maintenance of Transportation.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents