Similar Projects
Hodgdon High School Paving Project
Bidding
Hodgden, ME 04730

Main Street Resurfacing Project
Bidding
Bangor, ME

Striping Trucks - Electronic Pavement Marking Systems Maintenance and Repair/Statewide
Post-Bid

Striping Trucks - Electronic Pavement Marking Systems Maintenance and Repair/Statewide
Post-Bid

Airfield Access Road Repair
Results
$25,000 to $100,000 est. value
Bangor, ME 04401

Paving Bid 2018
Results
Hampden, ME

Road Paving
Bidding
Saint Agatha, ME

Asphalt Street Paving - 2019
Post-Bid
Houlton, ME

Highway Safety and Spot Improvements/ Located at the Intersection of Coldbrook, Odlin, and Emerson Mill Roads
Results
Hermon, ME

2020 Paving Project
Bidding
Madawaska, ME

Repair B541 Access Road
Post-Bid
$100,000 to $250,000 est. value
Bangor, ME 04401

(LCP) Light Capital Paving
Results
Less than $1,200,000 est. value
Baldwin, Bridgton, Casco, Fryeburg, Lovell, Naples, Sebago, Sweden, Waterford, ME

Repair Marran Street Pavements
Post-Bid
$250,000 to $500,000 est. value
Bangor, ME 04401

(LCP) Light Capital Paving
Results
Less than $1,400,000 est. value

Katahdin Valley Health Center Parking Lot
New Construction, Demolition
Post-Bid
Patten, ME 04765

Last Updated 02/28/2019 04:33 AM
Project Title

(LCP) Light Capital Paving

Physical Address View project details and contacts
City, State (County) (Aroostook, Penobscot Counties)
Category(s) Heavy and Highway
Sub-Category(s) Paving/Reconstruction
Contracting Method Competitive Bids.
Project Status Results
Bids Due View project details and contacts
Estimated Value $840,000
Plans Available from
Owner View project details and contacts
Architect View project details and contacts
Description Light Capital Paving and other incidental work. In Aroostook and Penobscot Counties, project is located: Map Id 1 Is In Dyer Brook And Oakfield On The Keith Brook Road, Burpee Brook Road, And The River Roadbeginning At On The Keith Brook Road The Intersection With Route 2 And Extending Easterly To The Intersectionwith The River Road; Then Continuing Northerly On The River Road To The Intersection With The 1-95northbound On-Ramp. Map Id 2 Is In Herseytown Twp, Stacyville, And Sherman On Route 11 Beginning At Thesoldiertown/Herseytown Township Line And Extending Northerly And Easterly To The Intersection With Route 158. Map Id 3 Is In New Limerick And Houlton On The Station Road And The Drews Lake Road Beginning On Thestation Road At The Intersection With Route 2 And Extending Southerly To The Intersection With The Drews Lake Road; The Continuing Easterly On The Drews Lake Road To The Intersection With Route 2a. Map Id 4 Is In Silver Ridge Twp On The Pond Road Beginning At The Intersection With Route 2 And Extending Southerly 0.80 Miles To 0.12 Miles North Of The Molunkus Stream Bridge (#5627).
Details
Division 01 - General Requirements, Vehicular Access and Parking, Traffic Control, Temporary Barriers and Enclosures.
Division 32 - Exterior Improvements, Flexible Paving, Asphalt Paving, Rigid Paving, Concrete Paving, Paving Specialties, Pavement Markings.
Division 33 - Utilities, Storm Drainage Utilities, Storm Drainage Structures.
Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents