Similar Projects
Hazel Green - Platteville Construction / Resrf20
Infrastructure
Conception
$6,000,000 to $7,000,000 est. value
Livingston, WI 53554

Cassville - Lancaster Const / Mill and O'lay / Rsrf
Infrastructure
Conception
$5,000,000 est. value
Lancaster, WI 53813

Red Barn Wind Farm
Renovation, Infrastructure
Design
$162,000,000 est. value
WI

Kieler - Cuba City (CTH H) Const Ops / Reconitioning
Infrastructure
Design
$6,000,000 CJ est. value
Cuba City, WI 53807

Lead Service Line Replacements
Infrastructure
Bidding
$200,000 CJ est. value
Boscobel, WI 53805

Lead Service Line Replacements
Infrastructure
Bidding
$200,000 CJ est. value
Boscobel, WI 53805

Basswood Road Resurfacing
Post-Bid
Muscoda, WI

Seal Coat
Post-Bid
Fennimore, WI

Airfield Paving Construction MATOC
Results
Less than $400,000,000 est. value

2021 Town Diamond Grove Road Improvement
Results
WI 53923

Twin Valley Road Improvements Governor Dodge State Park
Infrastructure
Construction
$1,790,500 CJ est. value
Middleton, WI 53562

Twin Valley Road Improvements Governor Dodge State Park
Infrastructure
Construction
$1,790,500 CJ est. value
Middleton, WI 53562

STH 133, Cassville - Patch Grove, 400 ft S CTH VV to STH 35, Grant
Infrastructure
Pending Verification
$9,000,000 CJ est. value
Mount Hope, WI 53816

STH 133, Cassville - Patch Grove, 400 ft S CTH VV to STH 35, Grant
Infrastructure
Pending Verification
$9,000,000 CJ est. value
Mount Hope, WI 53816

Dickeyville - Lancaster Const / Intersection Improvem / Recst
Infrastructure
Conception
$3,000,000 CJ est. value
Lancaster, WI 53813

Last Updated 09/06/2022 10:34 AM
Project Title

Proposed Pedestrian and Bicycle Trail

Physical Address View project details and contacts
City, State (County) Cassville, WI 53806   (Grant County)
Category(s) Heavy and Highway, Sewer and Water
Sub-Category(s) Maintenance, Paving/Reconstruction, Shoreline/Erosion/Drainage, Sidewalks/Parking Lot, Site Development, Water Lines
Contracting Method Competitive Bids
Project Status Bidding, Construction start expected October 2022
Bids Due View project details and contacts
Estimated Value $940,000 [brand] Estimate
Plans Available from Civil Engineer
Owner View project details and contacts
Architect View project details and contacts
Description

No proposal will be accepted unless accompanied by a certified check or bid bond equal to at least five percent (5%) of the amount bid, payable to the OWNER as a guarantee that, if the bid is accepted, the Bidder will execute and file the proper contract and bond within 15 days after the award of the contract. The certified check or bid bond will be returned to the Bidder as soon as the contract is signed. If after 15 days the Bidder shall fail to do so, the certified check or bid bond shall be forfeited to the OWNER as liquidated damages. BIDDER is required to deliver the original certified check, bank money order, or bid bond within 72 hours of bid opening to Delta 3 Engineering, Inc., Attn: Ms. Jamie Marcue, 875 S. Chestnut Street, Platteville, Wisconsin 53818. Bids may not be withdrawn within 90 days after the date of the bid opening. The OWNER reserves the right to increase or decrease the quantity of any item or portion of the work, or to omit portions of the work, as may be deemed necessary by the OWNER, and the same shall in no way affect or make void the contract, except that additions to, or deductions from, the contract price will be appropriately made. The OWNER reserves the right to waive any informalities, or to reject any or all bids, or any part of a bid, and to award the Contract to the Bidder, who in the judgment of the OWNER, will best serve the interest of the OWNER. Est. Value: - $ 940,000.00 Est. Completion Date: Aug. 25, 2023 Construction, Grubbing & Clearing, Pavement - Marking, Roadway Lighting, Aggregate, Pavement Resurface and Rehabilitation, Landscaping, Trails and/or Multipurpose Trails, Erosion Control/Slope, Bank Stabilization, Traffic Control, Fencing/Guardrails/Handrails, Fire Hydrant, Excavation, Signage, Sawcutting/Sidewalk/Pavement, Paving (Trail Paving), Roadway Pavement Markings, Culverts, Waterways, Stormwater Channels, Paving (Parking Lot Paving), Bituminous Patching/Coating/Surfacing, Erosion Control - Temporary o Description of Work: The Project consists of construction of approximately 8,500 feet of new pedestrian/bike trail, trail lights, fence, and trail amenities. Bids will be received for a single prime Contract. Bids shall be on a lump sum and unit price basis, with additive alternate bid items as indicated in the Bid Form. o Additonal Description: o Additional Conditions: The letting of the work described herein is subject to the provisions of Sections 61.54, 62.15, 66.0901, and 66.0903(1m) of the Wisconsin Statutes. This project is funded in part by a Community Development Block Grant Coronavirus Public Facilities (CDBG-CV-PF) from the Wisconsin Department of Administration using federal CDBG funds. Wage Rates: Minimum salaries and fringes to be paid on the Project shall be in accordance with the prevailing wage rate determination established by the Federal Department of Labor (DOL). Attention of bidders is particularly called to the requirements as to conditions of employment to be observed and minimum wage rates to be paid under contract, Section 3, Segregated Facility, Section 109 and E.O. 11246. Attention is also called to the fact that not less than the minimum salaries and fringes set forth in the Contract Documents must be paid on this Project, and that the Contractor must ensure that employees and applications for employment are not discriminated against because of their race, color, religion, sex, national origin, or other protected class. Federal Labor Standards program laws, including, but not limited to, the Davis-Bacon Act, the Copeland Anti-Kickback Act, and the Contract Work Hours and Safety Standards Act will apply to this Project. The Village encourages Minority-owned Business Enterprises (MBE's), Women's Business Enterprises (WBE's), Disadvantaged Business Enterprises (DBE's), and Small Businesses in Rural Areas (SBRA's) to submit bids. A municipality, in awarding prime contracts, and primary contractor, in awarding subcontractors, are required to make a good faith effort to achieve a combined minimum goal of participation for MBE/WBE utilization in accordance with s.NR 162.09(3), Wis. Admin. Code. If a subcontractor awards subcontracts, these requirements shall apply to the subcontractor. o Primary Contact Information o Owner Details o Owner Name: o Village of Cassville o Solicitor Details o Solicitor Name: o Delta 3 Engineering, Inc. o Design Discipline: o Soliciting agent o Address: o 875 South Chestnut Street, Platteville, WI - 53818 o Phone: o 608-348-5355 X1011 o Fax: o 608-348-5455 o Contact: o Jordan Fure X1011 o Email: o furej@delta3eng.biz

Details

Division 31 - Earthwork, Erosion and Sedimentation Controls, Earthwork Methods.
Division 32 - Exterior Improvements, Operation and Maintenance of Exterior Improvements, Bases, Ballasts, and Paving, Flexible Paving, Asphalt Paving, Rigid Paving, Concrete Paving, Curbs, Gutters, Sidewalks, and Driveways.
Division 33 - Utilities, Instrumentation and Control for Utilities, Water Utilities, Water Utility Distribution Piping, Water Utility Distribution Equipment, Disinfecting of Water Utility Distribution, Water Utility Storage Tanks, Storm Drainage Utilities, Ponds and Reservoirs.
Division 34 - Transportation, Operation and Maintenance of Transportation.
Division 35 - Waterway and Marine Construction, Shoreline Protection, Waterway Construction and Equipment.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents