Last Updated | 02/11/2019 10:41 AM |
Project Title | Miller Park Retaining Wall |
Physical Address | View project details and contacts |
City, State (County) | Lynchburg, VA (Lynchburg City County) |
Category(s) | Heavy and Highway |
Sub-Category(s) | Highway Signs/Guardrails/Barriers |
Contracting Method | Competitive Bids. |
Project Status | Results |
Bids Due | View project details and contacts |
Estimated Value | |
Plans Available from | Municipal Agency |
Owner | View project details and contacts |
Architect | View project details and contacts |
Description | Existing stone retaining wall along Park Avenue that borders Miller Park will be deconstructed and moved approximately five feet into the park. The rebuilt wall will have a concrete foundation and concrete stem wall faced with stone salvaged from the original wall. A foundation drain will be installed behind the rebuilt wall. The area in front of the rebuilt wall will be a grass covered mowing strip up to the existing sidewalk or a new sidewalk (to be installed by the City). Two electrical poles will be relocated or removed pending further input from the power company. The paved asphalt access road along the high side of the wall will be partially demolished and narrowed along its length. Grass will be established between the top of the rebuilt wall and the remaining paved asphalt access road. A vegetative buffer will be established along the top of the wall by the City in lieu of a guardrail | ||
Details |
|
||
Bidder's List | View project details and contacts | ||
Prospective Bidders | View project details and contacts | ||
Project Documents |
Engineered Spec Sheet Architectural Plans Other Documents |