Similar Projects
Cheswold Water Main Extension/Fire Protection
Post-Bid
Cheswold, DE 19936

High Pressure Hose Replacement
Post-Bid
Dover, DE 19902

New Castle County Facilities Management Buildings - Backflow Preventer Replacement
Results
Less than $204,679 est. value
Dover, DE 19901

4610--VHA Mar Cor Reverse Osmosis Water Purification BNOE | Sources Sought | 36U10120Q0029
Results

Marshalton Heights Water Main Renewal
Renovation
Post-Bid
Marshallton, DE

Domestic Water Main Replacement at Carrie Downie Elementary School
Results
New Castle, DE 19720

Heritage Elementary School Dehumidifier Installation
Post-Bid
Wilmington, DE 19808

Millsboro Main Street Sidewalk Replacement Project
Results
Millsboro, DE 19966

Water System Replacement and Upgrades
Infrastructure
Post-Bid
Frederica, DE

Mulberry Knoll Force Main and Pump Station
Results
Lewes, DE 19958

Morris Community Corrections Center - Sanitary Line Replacement
Infrastructure
Post-Bid
Dover, DE 19901

Breezewood Water Meter Replacement Project
Results
Rehoboth Beach, DE

Water Meter Replacement Project
Infrastructure
Post-Bid
Rehoboth Beach, DE

NorthEast Water Line Replacement
Results
Less than $1,155,810 est. value
Milford, DE 19963

Milford 2020 Utilities and Street Rehab Project
Infrastructure
Post-Bid
Milford, DE 19963

Last Updated 10/07/2021 02:19 PM
Project Title

Flow Meter and Rain Gauge Network Services

Physical Address View project details and contacts
City, State (County) New Castle, DE   (New Castle County)
Category(s) Sewer and Water
Sub-Category(s) Water Lines
Contracting Method Competitive Bids.
Project Status Results
Bids Due View project details and contacts
Estimated Value
Plans Available from County Agency
Owner View project details and contacts
Architect View project details and contacts
Description

The Service Provider shall assist the County with site selection for meter and rain gauge equipment relocations, installation, diagnostic, maintenance, repair, field confirmation, data analysis and reporting services for the County’s network of permanent meters and rain gauges at various locations throughout New Castle County. The Service Provider shall provide the same services for future temporary metering projects. The County currently has an inventory of thirty-two (32) ADS Trition+ wastewater flow monitors and ten (10) Rain Alert III rain gauges. The County shall have a minimum of twenty-five (25) and up to thirty-two (32) active wastewater flow monitors during the service and data reporting timeframe. The Service Provider shall be responsible for the installation, field confirmation and all maintenance and repairs of the equipment necessary to ensure continuous and accurate data collection and reporting for the life of the contract. The Service Provider is also responsible for the data analysis and reporting as specified herein.

Details

Division 33 - Utilities, Instrumentation and Control for Utilities, Water Utilities, Water Utility Distribution Piping, Water Utility Distribution Equipment, Disinfecting of Water Utility Distribution, Water Utility Storage Tanks.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents