Similar Projects
Pleasure Bay Crossing and Main Pump Station Replacement
Design
$20,000,000 est. value
Monmouth Beach, NJ 07750

Atrium and Hooton Pump Station Upgrades
Renovation
Bidding
$1,200,000 est. value
Willingboro, NJ

Pump Station No 4 Gravity Conversion
New Construction
Bidding
Parsippany, NJ

Diamond Drive Pump Station Rehabilitation
Post-Bid
Waretown, NJ 08758

Emergency Management Communications Building Sanitary Sewer Pump Station and Force Main
Post-Bid
Washington, NJ 07882

Replacement of Briggs Road and Library Pump Station Force Main Connections
Results
$800,000 est. value
Masonville, NJ 08054

Moonachie Avenue Pumping Station Comminutor Replacement
Results
Moonachie, NJ 07074

DDTH Pumping Station Project
Construction
Kearny, NJ 07032

WWTP Sludge Handling System and Emergency Pump Station Improvements
Renovation, Addition
Construction
Long Branch, NJ 07740

Pump Stations PS-2 and PS-3B Improvements
Renovation
Bidding
Jersey City, NJ

Rehabilitation of Bergen Street Pump Station
Post-Bid
Carteret, NJ 07008

Refurbishing of a Single Stage Vertical Pump, Intake Pump Station, Manasquan Water Supply System
Results
Wall, NJ 07727

Annual Contract for the Repairs to the Runyon and Florida Grove Road Booster Station Pumps, Motors and Appertunances
Term Contract
Bidding
Perth Amboy, NJ 08832

Pump Station #3 and 6 Control Retrofit and Installation
Post-Bid
Old Tappan, NJ 07675

Emergency Services for the Repair and Maintenance of Pumps, Motors, Shafts and Columns Repair Work for the Water and Sewer Utilities of the City of Perth Amboy Pumping Stations
Term Contract
Results
Perth Amboy, NJ 08861

Last Updated 12/09/2021 08:34 AM
Project Title

Construction of Storm Water Pumping Stations

Physical Address View project details and contacts
City, State (County) Ocean City, NJ 08226   (Cape May County)
Category(s) Sewer and Water
Sub-Category(s) Lift and Pump Stations
Contracting Method Competitive Bids.
Project Status Results, All Bids Rejected
Bids Due View project details and contacts
Estimated Value $8,568,130
Plans Available from
Owner View project details and contacts
Architect View project details and contacts
Description

Construction of Storm Water Pumping Stations Located at 10th St & Haven Ave and 14th St & Haven Ave The project consists of site work and utility work to install a series of storm drains, structures, discharge pipes, two storm water pump stations, and related pavement restoration.

Details

Lift and Pump Stations, New Construction.
Division 03 - Concrete.
Division 04 - Masonry.
Division 05 - Metals.
Division 06 - Wood, Plastics, and Composites.
Division 07 - Thermal and Moisture Protection.
Division 08 - Openings.
Division 09 - Finishes.
Division 10 - Specialties, Signage, Toilet, Bath, and Laundry Accessories, Fire Protection Specialties, Fire Extinguishers, Storage Specialties.
Division 11 - Equipment.
Division 12 - Furnishings.
Division 14 - Conveying Equipment, Scaffolding.
Division 21 - Fire Suppression.
Division 22 - Plumbing.
Division 23 - Heating, Ventilating, and Air Conditioning (HVAC).
Division 26 - Electrical.
Division 27 - Communications, Data Communications, Voice Communications, Audio-Video Systems.
Division 28 - Electronic Safety and Security.
Division 31 - Earthwork.
Division 32 - Exterior Improvements, Fences and Gates, Turf and Grasses.
Division 33 - Utilities, Common Work Results for Utilities, Water Utility Distribution Equipment, Water Utility Pumping Stations, Wastewater Utility Pumping Stations, Sanitary Utility Sewerage Force Mains.
Division 40 - Process Integration, Water Process Piping.
Division 45 - Industry-Specific Manufacturing Equipment.
Division 46 - Water and Wastewater Equipment.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents