Similar Projects
East Palatka Water Plant Retrofit
Renovation
Bidding
$890,000 est. value
East Palatka, FL 32131

Heineman Street Potable Ground Water Storage Tank and Pump Station
New Construction, Infrastructure
Bidding
$1,000,000 est. value
Daytona Beach, FL 32114

Well 3 Elevated Water Tank
Post-Bid
Sopchoppy, FL

Roof Repairs On An Above-Ground Fuel Storage Tank
Renovation
Post-Bid
Marathon, FL 33050

World-Wide Water Storage Tank Remediation
Term Contract
Results

World-Wide Water Storage Tank Remediation
Term Contract
Results

DeSoto County Utilities Potable Water Tanks Repair and Maintenance
Infrastructure
Bidding
Arcadia, FL 34266

Septic Systems For McDaniel Ranch
Alteration
Post-Bid
Clewiston, FL 33440

Elevated Water Tank Coating
Results
Mascotte, FL 34753

Leachate Wastewater Treatment Plant Storage Tank Repairs
Infrastructure
Bidding
$225,000 est. value
Punta Gorda, FL 33955

H345--FY22: Water Tank Cleaning
Term Contract
Post-Bid
Bay Pines, FL 33744

Picayune Strand Restoration Project, US41 and CR92 Conveyance Features, Design-Build Contract
Results
$5,000,000 to $10,000,000 est. value
FL

Fore Acres Water Treatment Plant Hydropneumatic Tank Replacement
Infrastructure
Bidding
$500,000 est. value
Ocala, FL 34479

Remove and Dispose of One 2,000-Gallon Above Storage Tank (AST)
Term Contract
Post-Bid
Jacksonville, FL 32218

Full Service Maintenance Program for Water Storage Tanks
Results
Frostproof, FL 33843

Last Updated 05/23/2022 01:59 PM
Project Title

Field Fabricated Tank

Physical Address View project details and contacts
City, State (County) Lakeland, FL   (Polk County)
Category(s) Sewer and Water
Sub-Category(s) Storage/Water Tanks
Contracting Method Competitive Bids.
Project Status Results
Bids Due View project details and contacts
Estimated Value
Plans Available from
Owner View project details and contacts
Architect View project details and contacts
Description

The City of Lakeland is seeking bids from qualified contractors for the design, manufacture, testing, furnishing, and delivery of the field fabricated tank as specified herein, complete with all required accessories as defined in the attached specification. The seller's scope of supply shall include the following tank: one (1) thermal buffer tank sized at 200,000 gallons of usable volume. The welded carbon steel tank shall be a vertical, cylindrical, flat-bottom type design and shall be designed and constructed in accordance with the latest edition of awwa d100.

Details

Division 02 - Existing Conditions, Subsurface Investigation.
Division 03 - Concrete, Concrete Reinforcing, Cast-in-Place Concrete.
Division 05 - Metals, Structural Metal Framing, Metal Decking.
Division 23 - Heating, Ventilating, and Air Conditioning (HVAC), Facility Fuel Piping, Facility Fuel-Storage Tanks.
Division 31 - Earthwork, Clearing and Grubbing, Grading.
Division 32 - Exterior Improvements, Fences and Gates.
Division 33 - Utilities, Storm Drainage Utilities.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents