Similar Projects
Popeye's Louisiana Kitchen
New Construction - 2,700 SF
Design
$500,000 to $1,000,000 CJ est. value
Richardson, TX 75081

Target #875
Renovation - 6,400 SF
Design
$500,000 est. value
Dallas, TX 75204

Heritage Community Park and Police Department Parking Lot Improvements
Post-Bid
Glenn Heights, TX 75154

Furneaux Creek Trail
Post-Bid
Carrollton, TX 75006

Sidewalk Repairs
Results
University Park, TX 75205

Utility Improvements for Highbridge Phase 2
Results
Dallas, TX 75206

Walmart Supercenter #3224-256 - Ogp-Ce
Renovation - 850 SF
Construction
Less than $7,161 est. value
Garland, TX 75043

Hawaiian Bros.
Renovation - 4,000 SF
Design
Addison, TX

ADA Transition Plan
Post-Bid
Mesquite, TX 75149

Delaware Creek Trail Connector
Results
$2,161,560 est. value
Irving, TX 75060

2020 Sidewalk and Barrier Free Ramp Improvements at Various Locations Contract
Post-Bid
Dallas, TX 75201

MacArthur Boulevard Trail Construction
Results
$1,300,000 est. value
Coppell, TX 75019

Architecture and Engineering Environmental Services for The United States Air Force (Ae Es 2020)
Post-Bid

Nevill Road Switching Station Grading (GP and L)
Results
$4,700,000 est. value
Garland, TX 75040

Vertical Construction Multiple Award Task Order Contract
New Construction, Addition
Post-Bid
$75,000 to $640,140,000 est. value

Last Updated 03/09/2021 12:19 PM
Project Title

Dallas Love Field Entry Road Enhancements

Physical Address View project details and contacts
City, State (County) Dallas, TX   (Dallas County)
Category(s) Heavy and Highway
Sub-Category(s) Sidewalks/Parking Lot
Contracting Method Competitive Bids.
Project Status Results
Bids Due View project details and contacts
Estimated Value $13,060,705
Plans Available from
Owner View project details and contacts
Architect View project details and contacts
Description

Demolition of existing sidewalks, lighting bollards, existing entry sign, existing streetlights, and existing landscaping. Improvements will provide new streetlights; pedestrian crosswalk with signals; sidewalks; installation of electrical transformer and outlets; landscaping and hardscape improvements; entry signage; and coordination with City of Dallas Office of Cultural Affairs’ installation of major public art near the intersection of Mockingbird Lane and Herb Kelleher Way.

Details

Division 31 - Earthwork, Earthwork Methods.
Division 32 - Exterior Improvements, Operation and Maintenance of Exterior Improvements, Bases, Ballasts, and Paving, Flexible Paving, Asphalt Paving, Rigid Paving, Concrete Paving, Curbs, Gutters, Sidewalks, and Driveways, Irrigation, Planting Irrigation, Planting, Planting Preparation, Soil Preparation, Landscape Grading.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents