Similar Projects
Tyndall AFB Civil Works IDIQ Sources Sought
Design
Panama City, FL 32403

Homestead ARB BAK 12
Bidding
$1,000,000 to $5,000,000 est. value
Homestead, FL 33033

AASF 2 Brooksville Armory - Flightline/Taxiway Aprons and Gate Replacement
Bidding
$400,000 to $500,000 est. value
Brooksville, FL 34604

Quincy Municipal Airport Box Hangar and Taxiway Project
Post-Bid
Quincy, FL 32352

Ground Run-Up Enclosure
Post-Bid
Less than $4,000,000 est. value
Melbourne, FL 32901

General Aviation Center Civil Package
Results
Punta Gorda, FL 33982

Rehabilitate Northeast Quadrant Taxiways A, B and C at Lakeland Linder International Airport
Results
Lakeland, FL 33801

Taxiway A (Phase 2 West Section) Pavement and Lighting Rehabilitation
Bidding
$1,000,000 to $1,400,000 est. value
Palatka, FL 32177

Taxiway B Rehabilitation Winter Haven Airport
Post-Bid
$358,000 est. value
Winter Haven, FL 33881

Repair Cracks, Joints, Slabs, Airfield
Results
$1,000,000 to $5,000,000 est. value
Patrick AFB, FL 32925

Crystal River Airport Runway 9-27 Pavement Rehabilitation Project
Bidding
$1,973,000 est. value
Crystal River, FL 34429

Rehabilitation of Runway 14-32
Post-Bid
Quincy, FL

Airport Segmented Circle at Treasure Coast International Airport and Business Park
Term Contract
Results
Fort Pierce, FL 34946

Taxiway `E` Extension
Bidding
Venice, FL

Runway 6-24 and Taxiway B and D Lighting Rehabilitation at Apalachicola Regional Airport
Post-Bid
Apalachicola, FL 32320

Reported 08/28/2020 12:00 AM
Project Title

Remove, Re-Grade, and Install New Rubberized Surface Material Under Static Aircraft Mounds.

Physical Address View project details and contacts
City, State (County) Panama City, FL 32403   (Bay County)
Category(s) Heavy and Highway
Sub-Category(s) Runways/Taxiways
Contracting Method Competitive Bids.
Project Status Accepting Letters of Interest
Bids Due View project details and contacts
Estimated Value
Plans Available from Federal Agency
Owner View project details and contacts
Architect View project details and contacts
Description

The Contractor shall provide all management, supervision, labor, materials, equipment, transportation, and incidental items necessary to replace approximately 11,404 square feet of damaged rubber overlay of four static aircraft mounds and remove approximately 14,764 square feet of white rock from four static aircraft mounds and replace with rubber. Contractor will be responsible for removal and off-site disposal of rubber and rocks that are currently installed. Once all rubber and rocks are removed, contractor will replace/re-grade substrate to ensure new rubber can be installed. Contractor will need to verify square footage before submitting packages.

Details

Division 07 - Thermal and Moisture Protection.
Division 09 - Finishes.
Division 31 - Earthwork, Grading, Earthwork Methods.
Division 32 - Exterior Improvements, Flexible Paving, Rigid Paving, Turf and Grasses.
Division 34 - Transportation, Airfield Signaling and Control Equipment.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents