Similar Projects
Beatty's Ford Park Play Beach Additions - Lincoln County
New Construction, Infrastructure
Conception
Less than $360,000 est. value
Denver, NC 28037

Creek Park & Little Egypt Subdivision
New Construction, Infrastructure
Design
$19,000,000 CJ est. value
Denver, NC 28037

Highway 150 Storage
New Construction, Infrastructure - 43,900 SF
Design
$1,100,000 CJ est. value
Lincolnton, NC 28092

Field Turf and Track Resurfacing
Renovation
Post-Bid
$1,250,000 est. value
Lincolnton, NC 28092

RFQ Construction Manager at Risk - Jail Expansion
Addition, Demolition, Infrastructure
Post-Bid
$3,000,000 CJ est. value
Lincolnton, NC 28092

Downton Parking Lot Project
Infrastructure
Results
$200,000 est. value
Lincolnton, NC 28092

Airport Hangar Site Preparation
Infrastructure
Results
$2,136,038 CJ est. value
Iron Station, NC 28080

Huber Technology Inc. / Lincoln County Office
New Construction, Infrastructure - 122,000 SF
Construction
$39,500,000 CJ est. value
Denver, NC 28037

Sunbelt Rentals Office and Showroom
New Construction, Infrastructure - 4,500 SF
Pending Verification
$1,000,000 CJ est. value
Denver, NC 28037

RFQ Construction Manager at Risk - Jail Expansion CMR
Demolition, New Construction, Renovation, Infrastructure
Post-Bid
Lincolnton, NC 28092

Catawba Springs Elementary School Pavement Improvement
Infrastructure
Results
$313,095 CJ est. value
Denver, NC 28037

Three Synthetic Turf Football Fields
Infrastructure
Post-Bid
$300,000 CJ est. value
Lincolnton, NC 28092

Take 5 Oil Change / Lincolnton
New Construction, Infrastructure - 1,489 SF
Post-Bid
$1,000,000 CJ est. value
Lincolnton, NC 28092

School Directional Signage
Infrastructure
Post-Bid
$250,000 CJ est. value
Lincolnton, NC 28092

Lincoln Commerce Center West Public Water Main Extension / Denver
Infrastructure
Post-Bid
$2,000,000 CJ est. value
Denver, NC 28037

Last Updated 08/31/2023 02:34 PM
Project Title

Westwinds Park Phase 3

Physical Address View project details and contacts
City, State (County) Lincolnton, NC 28092   (Lincoln County)
Category(s) Heavy and Highway
Sub-Category(s) Park/Playground, Site Development
Contracting Method Competitive Bids
Project Status Bidding, Construction start expected October 2023
Bids Due View project details and contacts
Estimated Value $250,000 [brand] Estimate
Plans Available from Civil Engineer
Owner View project details and contacts
Architect View project details and contacts
Description

Lincoln County reserves the right to reject all bids, to waive informalities and technicalities, and to cancel the Bid Process at any time. Provide labor, materials equipment and services to complete the Site Furnishings work, as indicated on the drawings, as specified herein or both. B. Including, but not necessarily limited to the following: 1. Shade Structures (3 total 12 x 20 x 10Height) 2. Concrete Benches (4 Total); Owner Provided, Contractor Installed 3. Metal Benches (6 total); Owner Provided, Contractor Installed 4. Outdoor Classroom Benches (4 @ 24 length; 2 @ 12 length; 2 @ 8 length) Note: Quantities shown above are for convenience only. Contractor is responsible for all furnishings shown on the drawings and as specified herein. Owner Provided Equipment: General Contractor is responsible for picking up the Owner Provided Equipment at the County Facilities Operations Center located at 435 Salem Church Road in Lincolnton, NC, deliver the equipment to the site, assemble and install per manufacturers specifications and instructions. E-mail all questions regarding specifications or requirements to Gary Wirth at gwirth@wirthassociates.coms. E-mail clarification of the bid process to John Henry at jhenry@lincolncounty.org. All questions are due by 1700 hrs on Thursday, August 24, 2023 to the persons above. 1.) The work of this contract includes, but is not limited to, demolition/light clearing, grading, erosion control, seeding, storm drainage, asphalt and concrete paving, stamped concrete, concrete seat walls, tensile fabric shade structures, trellis (addalternate #1), landscape planting, and site furnishings. 2.) Contractor shall furnish all material, labor, tools, supplies, equipment, transportation, temporary construction of every nature, insurance, taxes, contributions and all services and facilities, unless specifically excepted, and install all materials, items and equipment required to complete the construction of the Project, as set forth in the Contract. 3.) The General Contractor shall act as the Project Expediter and be responsible for coordinating the work and schedules of other trades.

Details

Division 11 - Equipment, Play Field Equipment and Structures, Playground Equipment, Play Structures.
Division 31 - Earthwork, Selective Clearing, Grading.
Division 32 - Exterior Improvements, Athletic and Recreational Surfacing, Site Improvements, Fences and Gates, Planting.
Division 33 - Utilities.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents