Similar Projects
Heritage Hunt Sewage Pumping Station (SPS) and Force Main (FM) Project
New Construction
Design
Woodbridge, VA

Rehabilitation of Activated Sludge Effluent Pump Station
Renovation
Bidding
$12,000,000 est. value
Lorton, VA 22079

Oak Marr Pump Station Rehabilitation Pre-Qualification
Renovation
Bidding
$1,500,000 to $2,000,000 est. value
Oakton, VA 22124

Plaza Bethune Pump Station No. 519 Replacement and Force Main Rehabilitation
Post-Bid
Less than $1,773,150 est. value
Virginia Beach, VA 23456

Qualification of CMAR - Quarry A (Milestone Reservoir) and Raw Water Pumping Station
Post-Bid
VA

Rady Park Pump Station Replacement
Results
Warrenton, VA

Construction of the Leachate Pump Station
Results
$2,586,790 est. value
Leesburg, VA 20175

Pump Station 23 Service Area Phase 8
Construction
Less than $4,500,000 est. value
Norfolk, VA

Langley School Pump Station and Force Main
Construction
$3,400,000 est. value
McLean, VA 22101

Design Build Services of Ivy Creek Interceptor Division 5 and 6 and Route 460 Pump Station
Post-Bid
Roanoke, VA

Route 50 Pump Station Replacement
Results
$1,500,000 to $2,500,000 est. value
Winchester, VA

St. Paul's Pump Station #156
New Construction
Construction
$3,000,000 to $3,737,570 est. value
Norfolk, VA 23504

Pump Station Communications Upgrade Project
Post-Bid
Portsmouth, VA

Kings Trail Pump Station 234 Replacement
Results
Less than $1,799,270 est. value
Virginia Beach, VA

Holmes Run Pump Station Rehabilitation
Renovation
Post-Bid
Falls Church, VA 22044

Reported 05/26/2022 12:00 AM
Project Title

DBP Improvements and Water Treatment Plant Upgrades Project - Contract II: Brickyard Pump Station Rehabilitation and the East End Pump Station Rehabilitation

Physical Address View project details and contacts
City, State (County) Richlands, VA 24641   (Tazewell County)
Category(s) Sewer and Water
Sub-Category(s) Lift and Pump Stations
Contracting Method Competitive Bids.
Project Status Bidding, Construction Start Expected June 2022
Bids Due View project details and contacts
Estimated Value $200,000 to $300,000
Plans Available from Copy Center
Owner View project details and contacts
Architect View project details and contacts
Description

Contract I: Work at three (3) tanks include Airport Tank Rehabilitation, Airport Tank mixing system, Farmer Street Tank Rehabilitation, Farmer Street Tank mixing system, Downtown Tank cleaning, and Downtown Tank mixing system. Contract II: Work at pump stations including the Brickyard Pump Station Rehabilitation and the East End Pump Station Rehabilitation. Contract III: Work at the water treatment plant (WTP) including the replacement of the filter media and underdrains, filter gallery valves and actuators, sedimentation basin sludge removal system and sedimentation basin crack repair epoxy injection, reduced pressure zone device RPZ relocation, the installation of a new shelter and electric hoist at the raw water intake, and the replacement of one existing finished water pump. Contract IV: 900 linear feet of 10-inch water line (C900 DDR 14 PVC), 5,200 linear feet of 8-inch water line (C900 DR14 PVC), 800 linear feet of 6-inch water line (C900 DR14 PVC) and related appurtenances, mag meter and pressure reducing solenoid valve with vault, school meter vault fireflow bypass, and encased river crossings water line replacements.

Details

Lift and Pump Stations, Renovation.
Division 03 - Concrete.
Division 04 - Masonry.
Division 05 - Metals.
Division 06 - Wood, Plastics, and Composites.
Division 07 - Thermal and Moisture Protection.
Division 08 - Openings.
Division 09 - Finishes.
Division 10 - Specialties, Signage, Toilet, Bath, and Laundry Accessories, Fire Protection Specialties, Fire Extinguishers, Storage Specialties.
Division 11 - Equipment.
Division 12 - Furnishings.
Division 14 - Conveying Equipment, Scaffolding.
Division 21 - Fire Suppression.
Division 22 - Plumbing.
Division 23 - Heating, Ventilating, and Air Conditioning (HVAC).
Division 26 - Electrical.
Division 27 - Communications, Data Communications, Voice Communications, Audio-Video Systems.
Division 28 - Electronic Safety and Security.
Division 31 - Earthwork.
Division 32 - Exterior Improvements, Fences and Gates, Turf and Grasses.
Division 33 - Utilities, Common Work Results for Utilities, Water Utility Distribution Equipment, Water Utility Pumping Stations, Wastewater Utility Pumping Stations, Sanitary Utility Sewerage Force Mains.
Division 40 - Process Integration, Water Process Piping.
Division 45 - Industry-Specific Manufacturing Equipment.
Division 46 - Water and Wastewater Equipment.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents