Similar Projects
Klaskanine Fish Hatchery Intake 3 Fish Passage Project
Infrastructure
Bidding
$360,000 est. value
Astoria, OR 97103

Klaskanine Bypass Pipe and Sluice Pipe Repair
Infrastructure
Bidding
$200,000 est. value
The Dalles, OR

Fairview Creek Pipe Culvert Joint Repair
Infrastructure
Post-Bid
Gresham, OR

Mouth of the Columbia River Sand Island Pile Dikes Repair
Alteration
Post-Bid
$25,000,000 to $100,000,000 est. value

OR 214 - Johna Ln. - Fenne Ln. (Silverton) Sec. Silver Creek Falls Vidal Francis, Pm
Infrastructure
Results
$500,000 to $1,000,000 est. value
Silverton, OR

ADA Ramps - W Baseline Road
Alteration
Results
$300,000 to $400,000 est. value
OR

OR34 Culvert at MP41.04 Repair Project
Alteration
Bidding
$250,000 est. value
Philomath, OR 97370

Windy Creek Bridge Replacement Reuben Road
New Construction, Infrastructure
Post-Bid
$2,100,000 est. value
Glendale, Roseburg, OR 97442

US101: MP 348.45 NB Landslide Mitigation
Infrastructure
Results
OR

Trans Pacific Parkway Drainage Improvement Project
Infrastructure
Bidding
$400,000 est. value
Coos Bay, OR 97420

Errol Heights
Infrastructure
Post-Bid
Portland, OR 34997

North Williams Street Storm Improvements
Infrastructure
Results
Lebanon, OR 97355

Skyline Partition Project
Infrastructure
Bidding
$190,000 est. value
West Linn, OR 97068

OR42: Frenchie Creek Culvert Project
Infrastructure
Post-Bid
$2,000,000 to $5,000,000 est. value
Bridge, OR 97458

OR DOT CRGNSA 100(6), Historic Columbia River Highway State Trail
Term Contract, Alteration
Results
Hood River, OR

Reported 05/06/2022 12:00 AM
Project Title

Vinegar to Vincent Fish Habitat Improvement Project Phase II

Physical Address View project details and contacts
City, State (County) Warm Springs, OR   (Jefferson County)
Category(s) Heavy and Highway
Sub-Category(s) Shoreline/Erosion/Drainage
Contracting Method Competitive Bids.
Project Status Request for Proposals (RFPs), Construction Start Expected July 2022
Bids Due View project details and contacts
Estimated Value $500,000 to $1,000,000
Plans Available from Municipal Agency
Owner View project details and contacts
Architect View project details and contacts
Description

Middle Fork John Day River proposes to excavate new river channels, install floodplain and large-woody debris (LWD) structures, construct riffles and bank features, and fill portions of the current river channel. This intended to improve floodplain connectivity and improve critical rearing and spawning habitat for Chinook salmon and ESA-listed steelhead.

Details

Division 31 - Earthwork, Erosion and Sedimentation Controls.
Division 33 - Utilities, Storm Drainage Utilities, Ponds and Reservoirs.
Division 35 - Waterway and Marine Construction, Shoreline Protection, Waterway Construction and Equipment.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents