Similar Projects
PC Air Units
Bidding
Charlotte, NC 28208

Construction of the Grady Cole-Electrical Modifications and HVAC Replacement Project
Bidding
Charlotte, NC

Utility Monitoring and Control Systems
Post-Bid
Less than $2,100,000,000 est. value

WRRC Building - Partial HVAC Replacement
Post-Bid
Charlotte, NC 28204

Air Handling Units 59 and 60
Results
Charlotte, NC

HVAC Water Chemical Treatment, Repair, and PM
Term Contract
Results
Charlotte, NC 28223

Ada Jenkins Center HVAC Renovations
Post-Bid
Davidson, NC 28036

McEniry HVAC Renovation
Results
Charlotte, NC

Heating, Venilation, Air Conditioning Maintenance Services
Post-Bid
Charlotte, NC

Craig Avenue Cooler Project
Results
Charlotte, NC 28211

Central Energy Plant Cooling Towers
Post-Bid
Charlotte, NC

HVAC Parts and Equipment
Results
Charlotte, NC

Central Energy Plant Centrifugal Water Chillers
Post-Bid
Charlotte, NC

Charlotte North Carolina HVAC Replacement
Results
$120,000 to $170,000 est. value
Charlotte, NC

Air Handling Unit 1 Replacement
Post-Bid
Charlotte, NC 28208

Reported 03/27/2019 12:00 AM
Project Title

Charlotte-Mecklenburg Animal Care and Control (CMACC) Dog Kennel HVAC System Enhancement

Physical Address View project details and contacts
City, State (County) Charlotte, NC 28217   (Mecklenburg County)
Category(s) Single Trades
Sub-Category(s) HVAC
Contracting Method Competitive Bids.
Project Status Bidding
Bids Due View project details and contacts
Estimated Value $1,800,000
Plans Available from Copy Center
Owner View project details and contacts
Architect View project details and contacts
Description The project consists of the enhancement of the existing HVAC system for the dog kennels at the Charlotte-Mecklenburg Animal Care and Control Facility. The existing kennels have approximately 5,900 sq. ft. of interior space with exterior spaces for the dogs. New four-pipe air handling units will condition the spaces to maintain a setpoint temperature range of 65 Fahrenheit to 85 Fahrenheit. One (1) new air cooled chiller (and chilled water appurtenances) will be located outside and will connect to the cooling coils of the air handling units. Two (2) new boilers (and appurtenances) will be located in the existing interior boiler room. These new boilers will connect to the heating coils in the new AHUs. New standalone dehumidification units will be installed to control the humidity inside the kennels to a maximum of 50% relative humidity. The existing rooftop exhaust fans will be replaced in kind and new rooftop air intakes will be installed to connect to the new AHUs. A new 480V/30 electrical service entrance will be installed to power all of the new equipment as part of this project. A new DDC control system will be installed to control all new equipment, as well as maintain the building at a positive pressure with respect to the outside. MSBE Goal is 7.00%
Details
Division 23 - Heating, Ventilating, and Air Conditioning (HVAC), Instrumentation and Control for HVAC, HVAC Air Distribution, Central HVAC Equipment.
Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents