Similar Projects
New Neighborhood School at Monument Ranch
New Construction
Conception
Perris, CA 92570

Paradise High School Science Room & Library Renovation
Renovation
Conception
$7,000,000 est. value
Paradise, CA 95969

Malibu Middle & High School
New Construction, Demolition
Design
$97,000,000 to $100,000,000 est. value
Malibu, CA 90265

Mammoth High School
Renovation
Design
Mammoth Lakes, CA 93546

Navigate at Mount Pleasant
Renovation
Bidding
$850,000 est. value
San Jose, CA 95127

Concession and Restroom Buildings at Antelope, Woodcreek, Roseville, Oakmont and Granite Bay High Schools
New Construction
Bidding
$2,000,000 est. value
Antelope, Granite Bay, Roseville, CA 95843

Chaffey High School South Hall Modernization Rebid BC06 Glazing
Renovation
Post-Bid
$20,000,000 est. value
Ontario, CA 91762

South El Monte High School Main Quad Modernization Project
Renovation
Post-Bid
$975,000 est. value
South El Monte, CA 91733

Suzanne Middle School New Two Story 10 Classroom Science and Technology Building and New Gymnasium
New Construction - 16,672 SF
Results
$17,000,000 est. value
Walnut, CA 91789

California School for The Deaf - Fremont Middle School Activity Building
New Construction
Results
$1,793,100 est. value
Fremont, CA 94538

Chino HS Reconstruction Phase II
Renovation
Construction
Chino, CA 91710

Arroyo High School New Building Part Two
New Construction
Construction
San Lorenzo, CA 94580

Odyssey School Expansion
Addition - 9,500 SF
Pending Verification
San Mateo, CA 94402

Paradise High School Building Modernization Building 400 & 500
Renovation, Addition
Conception
$2,000,000 est. value
Paradise, CA 95969

San Francisco University High School
New Construction - 49,000 SF
Design
San Francisco, CA 94115

Reported 04/30/2022 12:00 AM
Project Title

Desert Center Unified School District - Prequalification Package

Physical Address View project details and contacts
City, State (County) Desert Center, CA   (Riverside County)
Category(s) Education
Sub-Category(s) Middle/Senior High School
Contracting Method Competitive Bids. Bids by Invitation.
Project Status Bidding, Construction Start Expected May 2022
Bids Due View project details and contacts
Estimated Value $200,000 [brand] Estimate
Plans Available from Copy Center
Owner View project details and contacts
Architect View project details and contacts
Description

Refurbish, remodel, and modernize three (3) existing residential mobile home units on District property. These are existing non-DSA structures utilized to house non-students. The units are approximately 600 to 800 square feet each. The project includes but is not limited to: (a) selected demolition; (b) rough and finish carpentry repair; (c) wall repair; (d) drywall; (e) flooring; (f) cabinet/casework repair and/or replacement; (g) paint (interior and exterior); (h) electrical upgrades; (i) plumbing upgrades; (j) HVAC upgrades; (k) roofing repair and/or replacement; (l) windows and window treatments; (m) interior furnishing/furniture; and (n) door and lock repair and/or replacement. Work may include exterior stair, landing and porch repair and replacement.

Details

Middle/Senior High School, Renovation.
Division 02 - Existing Conditions, Demolition, Selective Demolition, Selective Interior Demolition.
Division 06 - Wood, Plastics, and Composites, Rough Carpentry, Finish Carpentry.
Division 07 - Thermal and Moisture Protection, Dampproofing and Waterproofing, Thermal Protection.
Division 08 - Openings, Doors and Frames, Windows.
Division 09 - Finishes, Plaster and Gypsum Board, Ceilings, Flooring, Painting and Coating.
Division 21 - Fire Suppression.
Division 22 - Plumbing.
Division 23 - Heating, Ventilating, and Air Conditioning (HVAC), Instrumentation and Control for HVAC, HVAC Air Distribution.
Division 26 - Electrical, Lighting.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents