Similar Projects
Blower Building 090 Blower - 23R04 - North Shore Water Reclamation District
Alteration
Conception
$1,409,400 est. value
Gurnee, IL

UV System Upgrade - Construction - 23R23 - North Shore Water Reclamation District
Alteration
Conception
$3,147,200 est. value
Gurnee, IL

Raw Influent Valve, Actuator, and Flowmeter At the Clavey Road Water Reclamation Facility
Infrastructure
Bidding
$550,000 est. value
Highland Park, IL

W3 Water Line Between Primary Tanks and Aeration Tanks
Infrastructure
Bidding
$430,000 est. value
Gurnee, IL

Vernon Hills West Pump Station Force Main Analysis for Lake County
Post-Bid
Waukegan, IL

Wickham Court Watermain Extension
Post-Bid
Green Oaks, IL 60048

Hawthorn Hills Square Watermain Replacement
Results
IL

Emergency Water Mains Repairs
Results
Grayslake, IL

PS1 24" Forcemain - Construction - 22A01 - North Shore Water Reclamation District
Infrastructure
Conception
Less than $5,368,000 est. value
Gurnee, IL

2021 Water Distribution Pressure Sensors
Post-Bid
Lake Forest, IL 60045

Pekara Watermain Lining Phase 1 and Walmart Fire Loop Lining
Results
Waukegan, IL

Clarifier Collection Systems - 18R01 - North Shore Water Reclamation District
Demolition, Alteration
Conception
$3,799,400 est. value
Gurnee, IL

Forest Cove Sanitary Lift Station Replacement
Post-Bid
Waukegan, IL

Water Main And Sanitary Sewer Improvements
Renovation
Results
Highland Park, IL

Deerpath Golf Course Cart Barn and Sprinkler System
Renovation
Post-Bid
Lake Forest, IL

Last Updated 07/12/2022 12:29 AM
Project Title

Whispering Hills Water Main Replacements

Physical Address View project details and contacts
City, State (County) Island Lake, IL   (Lake County)
Category(s) Sewer and Water
Sub-Category(s) Water Lines
Contracting Method Competitive Bids.
Project Status Results
Bids Due View project details and contacts
Estimated Value $500,000 [brand] Estimate
Plans Available from
Owner View project details and contacts
Architect View project details and contacts
Description

A. Demolition 1. Abandon existing water main and service line in place. B. Site Work 1. Replace existing water mains with new 4" and 6" DIP, PVC, or HDPE water mains. 2. Complete water main installation using a combination of horizontal directional drilling trenchless technology and open cut trenching techniques. 3. Re-establish all existing residential service connections up to the curb stop. 4. Surface restoration. 5. Erosion and sediment control measures.

Details

Division 33 - Utilities, Instrumentation and Control for Utilities, Water Utilities, Water Utility Distribution Piping, Water Utility Distribution Equipment, Disinfecting of Water Utility Distribution, Water Utility Storage Tanks.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents