Similar Projects
RFP Engineering - Compressed Air System Improvements at Jones Island Water Reclamation Facility
Renovation, Infrastructure
Conception
$1,400,000 CJ est. value
Milwaukee, WI 53207

RFP Engineering - Martha Washington / Highlands Area Miscellaneous Improvements
Infrastructure
Conception
$4,496,759 CJ est. value
Milwaukee, WI 53202

New Milwaukee Public Museum
New Construction, Infrastructure - 230,000 SF
Design
$240,000,000 CJ est. value
Milwaukee, WI 53202

New Milwaukee Public Museum
New Construction, Infrastructure - 230,000 SF
Design
$240,000,000 CJ est. value
Milwaukee, WI 53202

Hudson Wisconsin Weigh Facility (Building Only)
Infrastructure
Bidding
$1,200,000,000 CJ est. value
Milwaukee, WI 53233

Dock Decking and Bumper Replacement - Lakeshore State Park
Infrastructure
Bidding
$223,000 CJ est. value
Milwaukee, WI 53202

USH 45, Zoo IC, N. Leg Landscaping, Mayfair Road to Burleigh Street
Infrastructure
Sub-Bidding
$750,000 CJ est. value
West Allis, WI 53227

Public Construction Phase 4 Street Lighting at Westlawn Gardens Phase 2
Infrastructure
Sub-Bidding
$200,000 CJ est. value
Milwaukee, WI 53218

Panera Bread
Build-Out - 4,387 SF
Post-Bid
$650,000 est. value
Milwaukee, WI 53221

Oak Brewing Company
New Construction
Post-Bid
West Allis, WI 53214

DMC Food Court Servery and Cafeteria
New Construction, Renovation
Results
Milwaukee, WI 53233

Edgewood Avenue Near Surface Collector Extension
Infrastructure
Results
Milwaukee, WI

Chuck E Cheese #843
Renovation - 13,581 SF
Construction
West Allis, WI 53227

Taco Bell
New Construction
Construction
West Milwaukee, WI 53219

Johnson Controls Block Redevelopment
Build-out
Pending Verification
$10,000,000 CJ est. value
Milwaukee, WI 53202

Last Updated 08/05/2022 03:36 PM
Project Title

Texas Roadhouse / Oak Creek

Physical Address View project details and contacts
City, State (County) Oak Creek, WI 53154   (Milwaukee County)
Category(s) Commercial, Heavy and Highway
Sub-Category(s) Food/Beverage Service, Site Development
Contracting Method Bids by Invitation
Project Status Construction start expected July 2022
Bids Due View project details and contacts
Estimated Value $2,695,895 [brand] Estimate
Plans Available from General Contractor
Owner View project details and contacts
Architect View project details and contacts
Description

*This project is being bid by invitation only. If you have been contacted by the owner to bid on this project as a general contractor, and would like to be listed below, please notify our editorial staff. *The owner requests that all subcontractor / supplier inquiries be directed to the GC Bidder. *The bid list for this project may be incomplete. If you have been invited to bid on this project by the owner, please notify our editorial staff.

Details

1 Story Above Grade, 8,839 SF.
Division 03 - Concrete, Concrete Forming, Cast-in-Place Concrete.
Division 04 - Masonry, Unit Masonry.
Division 05 - Metals, Structural Metal Framing.
Division 06 - Wood, Plastics, and Composites, Rough Carpentry, Finish Carpentry.
Division 07 - Thermal and Moisture Protection, Dampproofing and Waterproofing, Thermal Protection, Weather Barriers.
Division 08 - Openings, Doors and Frames, Entrances and Storefronts, Windows.
Division 09 - Finishes, Plaster and Gypsum Board, Acoustical Ceilings, Resilient Flooring, Painting, Exterior Painting, Interior Painting.
Division 10 - Specialties, Signage, Compartments and Cubicles, Toilet Compartments, Fire Protection Specialties, Fire Protection Cabinets, Fire Extinguishers.
Division 11 - Equipment, Refrigerated Display Equipment, Foodservice Equipment, Foodservice Storage Equipment, Refrigerated Food Storage Cases, Walk-In Coolers, Foodservice Shelving, Food Cooking Equipment, Food Dispensing Equipment, Soda Fountain Equipment, Ice Machines, Cleaning and Disposal Equipment.
Division 12 - Furnishings, Countertops, Furnishing Accessories, Waste Receptacles, Rugs and Mats, Entrance Floor Mats and Frames, Site Furnishings, Trash and Litter Receptacles.
Division 21 - Fire Suppression, Instrumentation and Control for Fire-Suppression Systems.
Division 22 - Plumbing, Instrumentation and Control for Plumbing, Plumbing Piping, Plumbing Equipment, Plumbing Fixtures, Drinking Fountains and Water Coolers, Drinking Fountains.
Division 23 - Heating, Ventilating, and Air Conditioning (HVAC), Instrumentation and Control for HVAC, HVAC Air Distribution, Ventilation Hoods, Commercial-Kitchen Hoods.
Division 26 - Electrical, Instrumentation and Control for Electrical Systems, Power Distribution Units, Interior Lighting, Emergency Lighting, Exit Signs, Exterior Lighting, Lighting Poles and Standards, Parking Lighting.
Division 27 - Communications, Structured Cabling, Data Communications, Audio-Video Communications.
Division 28 - Electronic Safety and Security, Electronic Access Control and Intrusion Detection.
Division 31 - Earthwork, Site Clearing, Grading, Soil Treatment.
Division 32 - Exterior Improvements, Bases, Ballasts, and Paving, Flexible Paving, Asphalt Paving, Rigid Paving, Concrete Paving, Planting.
Division 33 - Utilities, Water Utilities, Sanitary Sewerage Utilities.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents